1,827MWh Curtailed
2,136MWh Ramped Up
€0.72MEst. Cost
193 MWPeak Positive
Day-Ahead Spot: 0-194 €/MWh (avg 88)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 12 | 7,939 |
| Amprion | positive | 2 | 962 |
| TenneT DE | positive | 1 | 649 |
| TransnetBW | positive | 1 | 48 |
| TransnetBW | negative | 1 | 20 |
| 50Hertz | negative | 1 | 4 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Büttel | TenneT DE | negative | 533 | 1,999 | 01:June-05:June | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,600 | 07:June-15:June | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,600 | 07:June-15:June | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 800 | 07:June-15:June | |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 276 | 690 | 01:June-03:June | |
| NIEDERAUSSEM_K | Amprion | Konventionell | positive | 294 | 662 | 07:June-09:June |
| Börse | TenneT DE | Sonstiges | positive | 173 | 649 | 01:June-05:June |
| Notfall-RD mit SHN | TenneT DE | negative | 433 | 325 | 01:June-01:June | |
| HUCKINGEN_A | Amprion | Konventionell | positive | 100 | 300 | 02:June-05:June |
| SHN Cluster Husum Nord | TenneT DE | negative | 150 | 262 | 01:June-03:June | |
| SHN Cluster Klixbüll | TenneT DE | negative | 158 | 237 | 01:June-03:June | |
| SHN Cluster Handewitt T414 T415 | TenneT DE | negative | 143 | 178 | 02:June-03:June | |
| SHN Cluster Heide West T413 | TenneT DE | negative | 77 | 134 | 01:June-03:June | |
| SHN Cluster Süderdonn T412 T413 | TenneT DE | negative | 64 | 111 | 01:June-02:June | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 193 | 48 | 07:June-07:June |
| Börse | TransnetBW | Sonstiges | negative | 80 | 20 | 09:June-09:June |
| Börse | 50Hertz | Sonstiges | negative | 6 | 4 | 11:June-12:June |
| UW Büttel | TenneT DE | negative | 1 | 3 | 00:June-04:June |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-06-20?
On 2026-06-20, estimated redispatch costs were approximately €0.72 million. This includes €0.18M for renewable curtailment compensation and €0.25M for conventional ramp-up costs.
Which power plants were most affected on 2026-06-20?
The most affected plant was UW Büttel (TenneT DE) with 1,999 MWh of negative redispatch.
What was the electricity spot price on 2026-06-20?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 194 €/MWh with an average of 88 €/MWh.