← 2026-06-16

Wednesday, June 17, 2026

2026-06-18 →
2,729MWh Curtailed
2,934MWh Ramped Up
€0.84MEst. Cost
171 MWPeak Positive

Day-Ahead Spot: 56-175 €/MWh (avg 117)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 12 12,774
50Hertz negative 29 10,260
Amprion positive 6 5,279
TenneT DE positive 4 3,109
TransnetBW positive 5 1,436
TransnetBW negative 1 359
Amprion negative 1 145
50Hertz positive 1 10

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 250 2,000 07:June-15:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 2,000 07:June-15:June
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 14 Schwandorf TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,600 07:June-15:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 294 1,470 06:June-11:June
Emsland Block C Amprion Konventionell positive 278 1,389 06:June-11:June
Emsland Block B Amprion Konventionell positive 192 1,341 05:June-12:June
Hannover-Linden GuD TenneT DE Konventionell positive 149 1,118 06:June-13:June
HAMMUENTROP_20 Amprion Konventionell positive 319 1,037 07:June-11:June
ReserveKW Staudinger 4 TenneT DE Konventionell positive 369 1,015 22:June-00:June
Börse TenneT DE Sonstiges negative 369 1,015 22:June-00:June
Boxberg (Standort) 50Hertz Konventionell negative 169 1,012 07:June-13:June
LAUSWARD_GUDF Amprion Konventionell positive 224 1,007 06:June-16:June
50H PV Witznitz 50Hertz Erneuerbar negative 182 912 07:June-16:June
Boxberg (Standort) 50Hertz Konventionell negative 113 904 06:June-14:June
SHN Cluster Kiel Süd TenneT DE Erneuerbar negative 58 841 01:June-22:June
UW Büttel TenneT DE Erneuerbar negative 332 831 17:June-20:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell positive 170 808 10:June-15:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 140 808 05:June-16:June
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 150 750 10:June-15:June
50H PV Bartow 50Hertz Erneuerbar negative 131 722 08:June-16:June
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 175 700 07:June-11:June
50H_AVA_CR_WOL 50Hertz Erneuerbar negative 140 595 08:June-13:June
illwerke vkw AG TransnetBW Sonstiges positive 146 585 18:June-22:June
UW Büttel TenneT DE Erneuerbar negative 146 585 18:June-22:June
illwerke vkw AG TransnetBW Sonstiges positive 142 568 17:June-21:June
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 154 500 18:June-22:June
50H_AVA_CR_STW 50Hertz Erneuerbar negative 257 450 09:June-11:June
HUCKINGEN_A Amprion Konventionell positive 97 388 18:June-22:June
Börse TransnetBW Sonstiges negative 80 359 08:June-13:June
50H Berlin Marzahn 50Hertz Konventionell negative 55 330 05:June-11:June
Jänschwalde (Standort) 50Hertz Konventionell negative 138 276 07:June-09:June
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 50 272 08:June-14:June
50H_MNS_CR_GRS 50Hertz Erneuerbar negative 100 225 10:June-12:June
Börse TransnetBW Sonstiges positive 81 182 06:June-20:June
SHN Cluster Lübeck TenneT DE Erneuerbar negative 12 177 01:June-22:June
Börse TenneT DE Sonstiges positive 96 168 17:June-20:June
NIEHL-31-GUD Amprion Konventionell negative 145 145 07:June-08:June
50H OWP Wikinger 50Hertz Erneuerbar negative 26 132 08:June-13:June
50H OWP Arkona 50Hertz Erneuerbar negative 24 119 08:June-13:June
GERSTEINW_F (KapRes) Amprion Konventionell positive 39 117 08:June-11:June
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 35 105 11:June-14:June
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 21 103 08:June-13:June
Börse 50Hertz Sonstiges negative 150 75 07:June-08:June
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 60 60 19:June-20:June
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 19 57 06:June-09:June
50H UW Schönewalde 50Hertz Erneuerbar negative 13 55 08:June-13:June
50H UW Bertikow 50Hertz Erneuerbar negative 14 55 08:June-13:June
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 11 49 08:June-16:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.25M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-17?

On 2026-06-17, estimated redispatch costs were approximately €0.84 million. This includes €0.27M for renewable curtailment compensation and €0.43M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-17?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,000 MWh of negative redispatch.

What was the electricity spot price on 2026-06-17?

The EPEX Day-Ahead spot price for DE_LU ranged from 56 to 175 €/MWh with an average of 117 €/MWh.