← 2026-03-30

Tuesday, March 31, 2026

2026-04-01 →
2,677MWh Curtailed
2,893MWh Ramped Up
€0.87MEst. Cost
203 MWPeak Positive

Day-Ahead Spot: 25-186 €/MWh (avg 114)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 10 9,532
50Hertz negative 28 8,861
TransnetBW positive 13 8,042
Amprion positive 8 6,046
TenneT DE positive 7 5,482
Amprion negative 3 4,530
TransnetBW negative 2 1,134
50Hertz positive 1 46

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
KMW_KW3 Amprion Konventionell positive 249 3,984 01:March-17:March
UW Büttel TenneT DE Erneuerbar negative 472 3,655 06:March-16:March
NIEDERAUSSEM_G Amprion Konventionell negative 233 2,451 04:March-15:March
NIEDERAUSSEM_K Amprion Konventionell negative 259 1,874 08:March-15:March
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 354 1,858 09:March-15:March
AVA Cluster Voslapp TenneT DE Erneuerbar negative 250 1,750 10:March-17:March
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 TransnetBW Konventionell positive 236 1,710 05:March-12:March
Frankfurt West 4 TenneT DE Konventionell positive 55 1,265 23:March-22:April
Boxberg (Standort) 50Hertz Konventionell negative 206 1,235 10:March-16:March
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 191 1,100 11:March-17:March
ReserveKW Ingolstadt 3 TenneT DE Konventionell positive 227 1,080 12:March-16:March
Linden GKL GT 1 TenneT DE Konventionell positive 69 1,065 02:March-18:March
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 308 1,002 15:March-18:March
50H PV Witznitz 50Hertz Erneuerbar negative 134 970 08:March-15:March
Linden GKL DT TenneT DE Konventionell positive 62 896 03:March-17:March
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 115 892 05:March-13:March
Linden GKL GT 3 TenneT DE Konventionell positive 56 872 02:March-18:March
50H OWP Arkona 50Hertz Erneuerbar negative 107 803 08:March-15:March
50H OWP Wikinger 50Hertz Erneuerbar negative 111 779 08:March-15:March
Lippendorf 50Hertz Konventionell negative 139 695 02:March-09:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 81 670 02:March-15:March
Schkopau 50Hertz Konventionell negative 221 663 06:March-09:March
Netzreservekraftwerk KMW 2 DT Amprion Konventionell positive 74 592 09:March-17:March
Börse TransnetBW Sonstiges negative 109 570 01:March-18:March
Rostock Kohlekraftwerk 50Hertz Konventionell negative 142 568 05:March-09:March
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 75 564 05:March-13:March
Börse TransnetBW Sonstiges negative 75 564 05:March-13:March
Emsland Block C Amprion Konventionell positive 110 550 10:March-15:March
Irsching 4 TenneT DE Konventionell negative 198 545 15:March-18:March
Börse TenneT DE Sonstiges negative 208 520 14:March-16:March
Irsching 5 TenneT DE Konventionell negative 197 493 16:March-18:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 175 482 14:March-16:March
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 127 445 09:March-13:March
Irsching 5 TenneT DE Konventionell negative 78 432 16:March-22:March
Irsching 4 TenneT DE Konventionell negative 55 385 23:March-06:April
50H UW Putlitz 50Hertz Erneuerbar negative 49 368 08:March-15:March
50H OWP Arkona 50Hertz Erneuerbar negative 89 355 11:March-15:March
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 166 332 16:March-18:March
50H_EDIS_CR_GUE_Nord 50Hertz Erneuerbar negative 88 288 12:March-15:March
50H UW Schönewalde 50Hertz Erneuerbar negative 36 280 07:March-15:March
Grosskraftwerk Mannheim Block 7 TransnetBW Konventionell positive 54 270 06:March-11:March
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 90 270 10:March-13:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 79 238 10:March-15:March
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 94 212 11:March-13:March
WEISWEILER_H Amprion Konventionell negative 68 205 05:March-08:March
Emsland Block D Amprion Konventionell positive 198 198 07:March-08:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 128 192 02:March-04:March
SW München KW-Pool TenneT DE Sonstiges positive 51 191 03:March-17:March
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 171 171 13:March-14:March
Boxberg (Standort) 50Hertz Konventionell negative 57 170 08:March-11:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.26M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-31?

On 2026-03-31, estimated redispatch costs were approximately €0.87 million. This includes €0.27M for renewable curtailment compensation and €0.42M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-31?

The most affected plant was KMW_KW3 (Amprion) with 3,984 MWh of positive redispatch.

What was the electricity spot price on 2026-03-31?

The EPEX Day-Ahead spot price for DE_LU ranged from 25 to 186 €/MWh with an average of 114 €/MWh.