← 2026-03-31

Wednesday, April 1, 2026

2026-04-02 →
2,770MWh Curtailed
3,373MWh Ramped Up
€1.06MEst. Cost
239 MWPeak Positive

Day-Ahead Spot: 70-230 €/MWh (avg 144)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TransnetBW positive 11 12,965
TenneT DE negative 19 11,245
50Hertz negative 21 9,219
Amprion positive 8 3,149
TenneT DE positive 2 1,268
Amprion negative 4 1,239
TransnetBW negative 1 429
50Hertz positive 1 10

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 293 3,668 05:April-18:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 260 2,600 22:April-08:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 236 2,128 07:April-22:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 350 1,925 08:April-14:April
Boxberg (Standort) 50Hertz Konventionell negative 182 1,634 09:April-18:April
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 380 1,520 10:April-14:April
Jänschwalde (Standort) 50Hertz Konventionell negative 229 1,374 08:April-14:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 207 1,295 08:April-22:April
Irsching 4 TenneT DE Konventionell negative 347 1,215 06:April-09:April
Irsching 5 TenneT DE Konventionell negative 304 1,139 05:April-09:April
illwerke vkw AG TransnetBW Sonstiges positive 260 1,106 06:April-11:April
Frankfurt West 4 TenneT DE Konventionell positive 55 1,105 22:April-18:April
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,100 08:April-14:April
GERSTEINW_DTF2 (KapRes) Amprion Konventionell positive 165 950 07:April-13:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 60 934 22:April-18:April
WALSUM_10 Amprion Konventionell negative 300 900 13:April-16:April
50H PV Witznitz 50Hertz Erneuerbar negative 127 856 08:April-16:April
Schkopau 50Hertz Konventionell negative 183 734 07:April-11:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 233 700 13:April-16:April
Schkopau 50Hertz Konventionell negative 174 695 06:April-12:April
50H Berlin Marzahn 50Hertz Konventionell negative 87 652 07:April-14:April
Rostock Kohlekraftwerk 50Hertz Konventionell negative 187 609 08:April-13:April
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 600 08:April-11:April
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 200 600 08:April-11:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 82 574 07:April-14:April
Emsland Block C Amprion Konventionell positive 175 525 06:April-09:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 82 489 09:April-16:April
WEISWEILERVGT_H3 Amprion Konventionell positive 156 468 07:April-10:April
Börse TransnetBW Sonstiges negative 90 429 05:April-18:April
50H Berlin Mitte 50Hertz Konventionell negative 100 401 07:April-11:April
BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt TenneT DE Erneuerbar negative 200 400 11:April-13:April
BAG NWAK-Cluster 02 Oberhaid-Redwitz TenneT DE Erneuerbar negative 200 400 11:April-13:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 107 376 07:April-11:April
GERSTEINW_GTF1 (KapRes) Amprion Konventionell positive 41 369 04:April-13:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 51 360 08:April-16:April
Kraftwerk Walheim GT D TransnetBW Konventionell positive 118 354 08:April-11:April
illwerke vkw AG TransnetBW Sonstiges positive 117 350 13:April-16:April
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 85 340 08:April-12:April
KMW_KW3 Amprion Konventionell positive 166 331 08:April-10:April
Irsching 5 TenneT DE Konventionell negative 55 329 16:April-22:April
BAG NWAK-Cluster 01 Mechlenreuth TenneT DE Erneuerbar negative 100 300 08:April-11:April
KMW_KW3 Amprion Konventionell positive 198 297 08:April-10:April
Jänschwalde (Standort) 50Hertz Konventionell negative 99 297 09:April-13:April
Boxberg (Standort) 50Hertz Konventionell negative 118 235 08:April-10:April
BAG NWAK-Cluster 01 Mechlenreuth TenneT DE Erneuerbar negative 100 200 11:April-13:April
Lippendorf 50Hertz Konventionell negative 97 194 16:April-18:April
Leitzach Pool TenneT DE Sonstiges negative 83 166 16:April-18:April
SW München KW-Pool TenneT DE Sonstiges positive 73 163 08:April-10:April
Börse Amprion Konventionell negative 190 143 13:April-14:April
NIEHL-II Amprion Konventionell positive 70 140 09:April-11:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-01?

On 2026-04-01, estimated redispatch costs were approximately €1.06 million. This includes €0.28M for renewable curtailment compensation and €0.59M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-01?

The most affected plant was Reservekraftwerk Heilbronn Block 7 (TransnetBW) with 3,668 MWh of positive redispatch.

What was the electricity spot price on 2026-04-01?

The EPEX Day-Ahead spot price for DE_LU ranged from 70 to 230 €/MWh with an average of 144 €/MWh.