2,569MWh Curtailed
2,889MWh Ramped Up
€0.83MEst. Cost
197 MWPeak Positive
Day-Ahead Spot: 47-186 €/MWh (avg 117)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 7 | 7,126 |
| 50Hertz | negative | 10 | 2,058 |
| TenneT DE | negative | 2 | 900 |
| 50Hertz | positive | 3 | 291 |
| TransnetBW | positive | 1 | 234 |
| Amprion | positive | 2 | 228 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 716 | 5,731 | 05:April-19:April |
| 50H PV Witznitz | 50Hertz | negative | 129 | 612 | 07:April-14:April | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 600 | 09:April-12:April | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 78 | 411 | 09:April-14:April |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 176 | 352 | 08:April-10:April |
| Linden GKL GT 1 | TenneT DE | Konventionell | positive | 57 | 340 | 08:April-14:April |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 164 | 328 | 08:April-10:April |
| Linden GKL GT 3 | TenneT DE | Konventionell | positive | 54 | 327 | 07:April-13:April |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 300 | 09:April-12:April | |
| Linden GKL DT | TenneT DE | Konventionell | positive | 50 | 300 | 08:April-14:April |
| Niederrad 1 | TenneT DE | Konventionell | positive | 30 | 240 | 09:April-17:April |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 94 | 234 | 07:April-13:April |
| Börse | 50Hertz | Sonstiges | positive | 35 | 228 | 22:April-06:April |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 200 | 200 | 11:April-12:April |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 57 | 185 | 08:April-11:April |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 168 | 168 | 09:April-10:April |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 37 | 84 | 11:April-13:April |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 20 | 60 | 07:April-13:April |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 19 | 38 | 06:April-08:April |
| Ahrensfelde A (KapRes) | 50Hertz | Konventionell | positive | 19 | 38 | 06:April-08:April |
| Börse | 50Hertz | Sonstiges | positive | 14 | 25 | 01:April-22:April |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 18 | 18 | 10:April-11:April |
| 50H PV Bartow | 50Hertz | negative | 23 | 12 | 08:April-11:April | |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 1 | 3 | 10:April-13:April |
| Börse | TenneT DE | Sonstiges | positive | 1 | 3 | 10:April-13:April |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.25M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-04-02?
On 2026-04-02, estimated redispatch costs were approximately €0.83 million. This includes €0.26M for renewable curtailment compensation and €0.42M for conventional ramp-up costs.
Which power plants were most affected on 2026-04-02?
The most affected plant was Börse (TenneT DE) with 5,731 MWh of positive redispatch.
What was the electricity spot price on 2026-04-02?
The EPEX Day-Ahead spot price for DE_LU ranged from 47 to 186 €/MWh with an average of 117 €/MWh.