← 2026-04-02

Friday, April 3, 2026

2026-04-04 →
2,046MWh Curtailed
1,815MWh Ramped Up
€0.6MEst. Cost
157 MWPeak Positive

Day-Ahead Spot: 0-177 €/MWh (avg 77)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 12 22,682
TransnetBW positive 9 10,146
Amprion positive 3 3,621
50Hertz negative 8 1,763
TenneT DE positive 1 1,595

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 426 5,958 22:April-22:April
UW Diele TenneT DE Erneuerbar negative 815 4,892 22:April-04:April
UW Diele TenneT DE Erneuerbar negative 431 4,744 11:April-22:April
AVA Cluster Voslapp TenneT DE Erneuerbar negative 336 3,694 11:April-22:April
AVA Cluster Voslapp TenneT DE Erneuerbar negative 309 2,238 22:April-05:April
Emsland Block C Amprion Konventionell positive 249 2,114 13:April-22:April
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 179 1,971 22:April-09:April
Börse TenneT DE Sonstiges positive 399 1,595 17:April-21:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 250 1,500 08:April-14:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 250 1,500 08:April-14:April
UW Emden-Ost TenneT DE Erneuerbar negative 232 1,394 22:April-04:April
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 457 1,372 19:April-22:April
UW Büttel TenneT DE Erneuerbar negative 266 1,330 16:April-22:April
NIEDERAUSSEM_H Amprion Konventionell positive 167 877 16:April-22:April
50H Berlin Marzahn 50Hertz Konventionell negative 129 645 14:April-20:April
Emsland Block C Amprion Konventionell positive 210 630 22:April-01:April
AVA Cluster Lehrte TenneT DE Erneuerbar negative 72 538 22:April-06:April
UW Büttel TenneT DE Erneuerbar negative 87 522 22:April-04:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 82 450 08:April-15:April
illwerke vkw AG TransnetBW Sonstiges positive 155 388 18:April-21:April
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 189 378 19:April-21:April
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 300 08:April-14:April
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 39 156 18:April-22:April
50H Berlin Mitte 50Hertz Konventionell negative 41 123 16:April-19:April
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 14 109 22:April-22:April
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 100 100 18:April-19:April
50H PV Witznitz 50Hertz Erneuerbar negative 38 76 14:April-16:April
Boxberg (Standort) 50Hertz Konventionell negative 74 74 16:April-17:April
illwerke vkw AG TransnetBW Sonstiges positive 80 60 22:April-22:April
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 60 30 21:April-22:April
UW Diele TenneT DE Erneuerbar negative 60 30 21:April-22:April
Börse 50Hertz Sonstiges negative 41 10 20:April-20:April
50H UW Bertikow 50Hertz Erneuerbar negative 14 7 15:April-16:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.18M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-03?

On 2026-04-03, estimated redispatch costs were approximately €0.6 million. This includes €0.2M for renewable curtailment compensation and €0.19M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-03?

The most affected plant was Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 (TransnetBW) with 5,958 MWh of positive redispatch.

What was the electricity spot price on 2026-04-03?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 177 €/MWh with an average of 77 €/MWh.