2,852MWh Curtailed
2,418MWh Ramped Up
€0.73MEst. Cost
176 MWPeak Positive
Day-Ahead Spot: -1-226 €/MWh (avg 111)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | positive | 27 | 26,707 |
| TenneT DE | negative | 12 | 21,244 |
| TenneT DE | positive | 8 | 9,422 |
| 50Hertz | negative | 12 | 1,896 |
| Amprion | negative | 4 | 1,648 |
| TransnetBW | negative | 3 | 546 |
| TransnetBW | positive | 6 | 523 |
| 50Hertz | positive | 5 | 335 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 530 | 8,616 | 22:August-22:August |
| Börse | TenneT DE | Sonstiges | positive | 945 | 5,196 | 06:August-18:August |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 287 | 4,738 | 03:August-20:August |
| WEISWEILER_G | Amprion | Konventionell | positive | 341 | 3,068 | 00:August-09:August |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 290 | 2,900 | 22:August-08:August |
| UW Diele | TenneT DE | negative | 237 | 2,845 | 04:August-16:August | |
| NIEHL-II | Amprion | Konventionell | positive | 180 | 2,828 | 22:August-21:August |
| KNAPSACK_20 | Amprion | Konventionell | positive | 254 | 1,970 | 00:August-08:August |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 150 | 1,944 | 22:August-11:August |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 384 | 1,918 | 22:August-03:August |
| Börse | TenneT DE | Sonstiges | negative | 375 | 1,876 | 22:August-03:August |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 1,875 | 08:August-16:August | |
| NIEHL-II | Amprion | Konventionell | positive | 146 | 1,753 | 01:August-22:August |
| Emsland Block B | Amprion | Konventionell | positive | 184 | 1,608 | 13:August-22:August |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 200 | 1,500 | 08:August-16:August | |
| AVA Cluster Voslapp | TenneT DE | negative | 217 | 1,462 | 09:August-16:August | |
| Emsland Block B | Amprion | Konventionell | positive | 181 | 1,404 | 00:August-08:August |
| STUMMHAFEN_10 | Amprion | Konventionell | negative | 181 | 1,269 | 07:August-22:August |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 1,125 | 08:August-16:August | |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 254 | 1,018 | 03:August-07:August |
| UW Büttel | TenneT DE | negative | 136 | 919 | 08:August-22:August | |
| GERSTEINW_K1 (KapRes) | Amprion | Konventionell | positive | 63 | 767 | 23:August-12:August |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 143 | 646 | 05:August-19:August |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 43 | 608 | 22:August-19:August |
| UW Büttel | TenneT DE | negative | 299 | 598 | 20:August-22:August | |
| 50H PV Witznitz | 50Hertz | negative | 169 | 593 | 12:August-16:August | |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 254 | 508 | 20:August-22:August |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | negative | 98 | 390 | 00:August-04:August |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 130 | 390 | 18:August-21:August |
| Emsland Block C | Amprion | Konventionell | positive | 146 | 364 | 01:August-05:August |
| Emsland Block B | Amprion | Konventionell | positive | 150 | 300 | 18:August-20:August |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 79 | 275 | 12:August-16:August | |
| 50H OWP Arkona | 50Hertz | negative | 79 | 275 | 12:August-16:August | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 64 | 271 | 15:August-19:August |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 67 | 268 | 18:August-22:August |
| NEURATH_G | Amprion | Konventionell | negative | 63 | 252 | 04:August-08:August |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 71 | 232 | 22:August-06:August |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 153 | 230 | 07:August-08:August |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | negative | 94 | 212 | 00:August-03:August |
| Emsland Block C | Amprion | Konventionell | positive | 210 | 210 | 07:August-08:August |
| Börse | TransnetBW | Sonstiges | positive | 69 | 208 | 22:August-20:August |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 41 | 207 | 00:August-08:August |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 66 | 198 | 02:August-07:August |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 26 | 157 | 16:August-22:August |
| Emsland Block B | Amprion | Konventionell | positive | 52 | 156 | 04:August-07:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 142 | 142 | 01:August-02:August |
| Robert Frank 4 GT (KapRes) | TenneT DE | Konventionell | positive | 28 | 140 | 16:August-21:August |
| 50H InfraLeuna IKW | 50Hertz | Konventionell | positive | 28 | 140 | 17:August-22:August |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | negative | 70 | 140 | 01:August-04:August |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 90 | 135 | 17:August-19:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-05?
On 2026-08-05, estimated redispatch costs were approximately €0.73 million. This includes €0.29M for renewable curtailment compensation and €0.34M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-05?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 8,616 MWh of negative redispatch.
What was the electricity spot price on 2026-08-05?
The EPEX Day-Ahead spot price for DE_LU ranged from -1 to 226 €/MWh with an average of 111 €/MWh.