3,168MWh Curtailed
3,384MWh Ramped Up
€1.1MEst. Cost
209 MWPeak Positive
Day-Ahead Spot: 71-304 €/MWh (avg 150)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 10 | 19,503 |
| Amprion | positive | 11 | 15,029 |
| TenneT DE | positive | 6 | 8,791 |
| TransnetBW | positive | 4 | 922 |
| 50Hertz | negative | 6 | 771 |
| TransnetBW | negative | 2 | 540 |
| 50Hertz | positive | 1 | 54 |
| Amprion | negative | 1 | 14 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 472 | 11,333 | 22:August-22:August |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 385 | 4,720 | 22:August-22:August |
| Knapsack 1 | Amprion | Konventionell | positive | 503 | 4,026 | 23:August-07:August |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 253 | 3,666 | 22:August-18:August |
| Emsland Block C | Amprion | Konventionell | positive | 205 | 3,332 | 22:August-22:August |
| Börse | TenneT DE | Sonstiges | negative | 294 | 2,863 | 22:August-22:August |
| UW Büttel | TenneT DE | negative | 237 | 2,196 | 04:August-21:August | |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 154 | 1,691 | 07:August-18:August |
| Emsland Block C | Amprion | Konventionell | positive | 330 | 1,648 | 16:August-21:August |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 262 | 1,572 | 16:August-22:August |
| Börse | TenneT DE | Sonstiges | negative | 156 | 1,525 | 07:August-17:August |
| Emsland Block B | Amprion | Konventionell | positive | 177 | 927 | 15:August-20:August |
| Emsland Block B | Amprion | Konventionell | positive | 214 | 858 | 00:August-04:August |
| Börse | TenneT DE | Sonstiges | negative | 250 | 500 | 16:August-22:August |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 100 | 500 | 10:August-15:August | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 95 | 476 | 16:August-21:August |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 115 | 461 | 22:August-02:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 85 | 342 | 17:August-21:August |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 77 | 325 | 02:August-07:August |
| Börse | TransnetBW | Sonstiges | negative | 92 | 324 | 23:August-17:August |
| Kraftwerk Walheim GT D | TransnetBW | Konventionell | positive | 100 | 300 | 17:August-20:August |
| UW Büttel | TenneT DE | negative | 232 | 290 | 02:August-04:August | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 50 | 250 | 10:August-15:August | |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 60 | 240 | 17:August-21:August |
| Börse | TransnetBW | Sonstiges | negative | 173 | 216 | 06:August-09:August |
| Emsland Block C | Amprion | Konventionell | positive | 210 | 210 | 21:August-22:August |
| Heizkraftwerk Altbach/Deizisau GT E | TransnetBW | Konventionell | positive | 60 | 180 | 17:August-20:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 130 | 130 | 21:August-22:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 100 | 100 | 19:August-20:August |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 83 | 83 | 03:August-04:August |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 80 | 80 | 21:August-22:August |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 38 | 76 | 00:August-02:August |
| 50H Dresden-Reick | 50Hertz | Konventionell | positive | 18 | 54 | 03:August-06:August |
| UW Diele | TenneT DE | negative | 53 | 40 | 01:August-02:August | |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 10 | 25 | 08:August-14:August |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 60 | 15 | 22:August-22:August |
| Börse | Amprion | Konventionell | positive | 55 | 14 | 14:August-15:August |
| Börse | Amprion | Konventionell | negative | 55 | 14 | 14:August-14:August |
| Börse | 50Hertz | Sonstiges | negative | 34 | 9 | 16:August-16:August |
| Reisach | TenneT DE | Sonstiges | positive | 1 | 6 | 08:August-14:August |
| Börse | TenneT DE | Sonstiges | negative | 1 | 6 | 08:August-14:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.33M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-04?
On 2026-08-04, estimated redispatch costs were approximately €1.1 million. This includes €0.32M for renewable curtailment compensation and €0.61M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-04?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 11,333 MWh of negative redispatch.
What was the electricity spot price on 2026-08-04?
The EPEX Day-Ahead spot price for DE_LU ranged from 71 to 304 €/MWh with an average of 150 €/MWh.