3,454MWh Curtailed
3,267MWh Ramped Up
€1.07MEst. Cost
212 MWPeak Positive
Day-Ahead Spot: 0-211 €/MWh (avg 136)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 15 | 32,523 |
| Amprion | positive | 25 | 29,890 |
| TenneT DE | positive | 6 | 9,755 |
| TransnetBW | positive | 12 | 9,239 |
| 50Hertz | negative | 10 | 1,757 |
| TransnetBW | negative | 2 | 1,662 |
| Amprion | negative | 4 | 442 |
| 50Hertz | positive | 1 | 8 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Dörpen-West | TenneT DE | negative | 1103 | 14,342 | 09:September-22:September | |
| Börse | TenneT DE | Sonstiges | positive | 835 | 5,842 | 15:September-22:September |
| UW Diele | TenneT DE | negative | 375 | 4,881 | 09:September-22:September | |
| WEISWEILER_G | Amprion | Konventionell | positive | 293 | 4,682 | 22:September-14:September |
| UW Dörpen-West | TenneT DE | negative | 677 | 3,386 | 22:September-03:September | |
| WEISWEILER_G | Amprion | Konventionell | positive | 240 | 3,360 | 08:September-22:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 439 | 3,290 | 14:September-22:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 381 | 2,763 | 14:September-22:September |
| HERDECKE_H6 | Amprion | Konventionell | positive | 335 | 2,594 | 14:September-22:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 312 | 2,572 | 13:September-22:September |
| NIEHL-II | Amprion | Konventionell | positive | 232 | 2,317 | 12:September-22:September |
| WEISWEILER_G | Amprion | Konventionell | positive | 286 | 2,285 | 14:September-22:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 246 | 1,970 | 13:September-21:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 314 | 1,884 | 22:September-04:September |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | negative | 158 | 1,617 | 22:September-08:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 230 | 1,611 | 14:September-21:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 297 | 1,487 | 22:September-03:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 211 | 1,477 | 15:September-22:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 273 | 1,432 | 22:September-03:September |
| Emsland Block D | Amprion | Konventionell | positive | 203 | 1,420 | 12:September-22:September |
| Irsching 5 | TenneT DE | Konventionell | positive | 404 | 1,415 | 18:September-22:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 206 | 1,235 | 16:September-22:September |
| UW Diele | TenneT DE | negative | 333 | 1,165 | 12:September-16:September | |
| Emsland Block D | Amprion | Konventionell | positive | 359 | 1,076 | 22:September-01:September |
| UW Emden-Ost | TenneT DE | negative | 70 | 908 | 09:September-22:September | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 128 | 898 | 13:September-20:September |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 150 | 825 | 10:September-16:September | |
| WALSUM_10 | Amprion | Konventionell | positive | 250 | 811 | 12:September-15:September |
| UW Diele | TenneT DE | negative | 380 | 761 | 22:September-00:September | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 195 | 732 | 16:September-22:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 276 | 691 | 17:September-19:September |
| Irsching 5 | TenneT DE | Konventionell | positive | 320 | 640 | 22:September-00:September |
| Börse | TenneT DE | Sonstiges | positive | 625 | 625 | 22:September-23:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 237 | 594 | 22:September-00:September |
| KNAPSACK_20 | Amprion | Konventionell | positive | 131 | 589 | 15:September-20:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 94 | 588 | 22:September-14:September |
| HERDECKE_H6 | Amprion | Konventionell | positive | 222 | 556 | 22:September-00:September |
| UW Emden-Ost | TenneT DE | negative | 466 | 466 | 22:September-23:September | |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 201 | 402 | 20:September-22:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 228 | 400 | 22:September-23:September |
| Irsching 4 | TenneT DE | Konventionell | positive | 89 | 335 | 13:September-17:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 195 | 292 | 22:September-23:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 57 | 285 | 10:September-15:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 186 | 278 | 12:September-15:September |
| NIEDERAUSSEM_K | Amprion | Konventionell | positive | 130 | 261 | 13:September-15:September |
| Hannover (GKH) 2 | TenneT DE | Konventionell | negative | 61 | 244 | 22:September-02:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 56 | 236 | 17:September-21:September |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | negative | 36 | 235 | 22:September-06:September |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 89 | 222 | 22:September-00:September |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | negative | 40 | 199 | 16:September-22:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.32M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-12?
On 2026-09-12, estimated redispatch costs were approximately €1.07 million. This includes €0.35M for renewable curtailment compensation and €0.54M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-12?
The most affected plant was UW Dörpen-West (TenneT DE) with 14,342 MWh of negative redispatch.
What was the electricity spot price on 2026-09-12?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 211 €/MWh with an average of 136 €/MWh.