3,813MWh Curtailed
4,812MWh Ramped Up
€1.71MEst. Cost
559 MWPeak Positive
Day-Ahead Spot: 62-585 €/MWh (avg 194)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 9 | 20,541 |
| TransnetBW | positive | 17 | 16,406 |
| Amprion | positive | 15 | 15,311 |
| TransnetBW | negative | 2 | 4,250 |
| 50Hertz | negative | 13 | 3,655 |
| TenneT DE | positive | 12 | 3,431 |
| 50Hertz | positive | 3 | 985 |
| Amprion | negative | 8 | 960 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 510 | 8,160 | 22:September-14:September |
| UW Dörpen-West | TenneT DE | negative | 1116 | 6,698 | 22:September-04:September | |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | negative | 177 | 4,065 | 22:September-22:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 304 | 3,952 | 22:September-11:September |
| HERDECKE_H6 | Amprion | Konventionell | positive | 201 | 3,370 | 22:September-14:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 175 | 3,329 | 22:September-22:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 374 | 2,900 | 08:September-15:September |
| Emsland Block C | Amprion | Konventionell | positive | 192 | 2,397 | 22:September-10:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 283 | 2,262 | 22:September-06:September |
| UW Diele | TenneT DE | negative | 353 | 2,116 | 22:September-04:September | |
| Börse | TransnetBW | Sonstiges | positive | 179 | 1,477 | 13:September-22:September |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 268 | 1,475 | 22:September-04:September |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,400 | 09:September-16:September | |
| Emsland Block B | Amprion | Konventionell | positive | 201 | 1,358 | 00:September-06:September |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 339 | 1,357 | 18:September-22:September |
| Emsland Block B | Amprion | Konventionell | positive | 183 | 1,238 | 22:September-04:September |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 109 | 1,112 | 22:September-08:September |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 114 | 1,050 | 22:September-08:September |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 292 | 1,021 | 07:September-10:September |
| HERDECKE_H6 | Amprion | Konventionell | positive | 205 | 924 | 06:September-10:September |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 115 | 918 | 22:September-06:September |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 148 | 890 | 09:September-15:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 171 | 856 | 07:September-22:September |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 106 | 688 | 13:September-20:September |
| Schkopau | 50Hertz | Konventionell | positive | 128 | 642 | 16:September-21:September |
| Emsland Block C | Amprion | Konventionell | positive | 195 | 584 | 19:September-22:September |
| Schkopau | 50Hertz | Konventionell | negative | 179 | 537 | 06:September-09:September |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 132 | 528 | 09:September-13:September |
| Reservekraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 213 | 480 | 06:September-09:September |
| Emsland Block C | Amprion | Konventionell | positive | 111 | 471 | 00:September-05:September |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 79 | 412 | 08:September-13:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 179 | 403 | 04:September-07:September |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 160 | 360 | 06:September-09:September |
| Emsland Block B | Amprion | Konventionell | positive | 102 | 356 | 18:September-22:September |
| 50H Berlin Mitte | 50Hertz | Konventionell | positive | 97 | 339 | 17:September-21:September |
| WALSUM_10 | Amprion | Konventionell | positive | 120 | 330 | 10:September-12:September |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 141 | 318 | 19:September-21:September |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 135 | 304 | 00:September-09:September |
| 50H UW Bertikow | 50Hertz | negative | 130 | 293 | 07:September-12:September | |
| UW Dörpen-West | TenneT DE | negative | 140 | 280 | 20:September-22:September | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 76 | 266 | 04:September-11:September |
| UW Emden-Ost | TenneT DE | negative | 50 | 250 | 22:September-03:September | |
| HERDECKE_H6 | Amprion | Konventionell | negative | 82 | 245 | 18:September-21:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 161 | 241 | 07:September-09:September |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 240 | 240 | 01:September-02:September |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 104 | 208 | 20:September-22:September |
| Börse | TransnetBW | Sonstiges | negative | 53 | 185 | 08:September-19:September |
| UW Dörpen-West | TenneT DE | negative | 95 | 166 | 19:September-22:September | |
| Emsland Block D | Amprion | Konventionell | negative | 80 | 161 | 19:September-21:September |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 90 | 157 | 07:September-11:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.51M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-10?
On 2026-09-10, estimated redispatch costs were approximately €1.71 million. This includes €0.38M for renewable curtailment compensation and €1.08M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-10?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 8,160 MWh of negative redispatch.
What was the electricity spot price on 2026-09-10?
The EPEX Day-Ahead spot price for DE_LU ranged from 62 to 585 €/MWh with an average of 194 €/MWh.