← 2026-05-10

Monday, May 11, 2026

2026-05-12 →
2,802MWh Curtailed
2,579MWh Ramped Up
€0.8MEst. Cost
219 MWPeak Positive

Day-Ahead Spot: 91-174 €/MWh (avg 118)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 15 11,359
TenneT DE positive 6 3,123
Amprion positive 8 3,082
Amprion negative 6 1,719
50Hertz positive 1 1,328
TransnetBW positive 8 1,191
50Hertz negative 3 539
TransnetBW negative 2 259

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 269 1,885 09:May-16:May
Notfall-RD mit AVA TenneT DE Erneuerbar negative 99 1,712 22:May-15:May
Hannover-Linden GuD TenneT DE Konventionell positive 133 1,625 09:May-22:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 205 1,585 11:May-19:May
UW Emden-Ost TenneT DE Erneuerbar negative 350 1,574 12:May-17:May
Notfall-RD mit AVA TenneT DE Erneuerbar negative 150 1,498 12:May-22:May
Schkopau 50Hertz Konventionell positive 221 1,328 10:May-16:May
Börse Amprion Konventionell negative 130 971 08:May-16:May
Netzreservekraftwerk VOELKLINGEN_HKV Amprion Konventionell positive 128 930 08:May-15:May
Hannover-Linden GuD TenneT DE Konventionell positive 133 867 22:May-04:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 100 753 22:May-06:May
UW Dörpen-West TenneT DE Erneuerbar negative 250 750 12:May-15:May
WEISWEILER_H Amprion Konventionell positive 271 609 14:May-16:May
UW Dörpen-West TenneT DE Erneuerbar negative 200 600 13:May-16:May
STUMMHAFEN_10 Amprion Konventionell positive 150 450 12:May-15:May
UW Emden-Ost TenneT DE Erneuerbar negative 87 413 17:May-22:May
STUMMHAFEN_10 Amprion Konventionell positive 236 412 13:May-15:May
NIEDERAUSSEM_G Amprion Konventionell negative 100 400 22:May-02:May
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 68 391 09:May-15:May
SW München KW-Pool TenneT DE Sonstiges positive 126 378 15:May-18:May
Notfall-RD mit AVA TenneT DE Erneuerbar negative 155 349 13:May-15:May
illwerke vkw AG TransnetBW Sonstiges positive 173 346 12:May-17:May
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 66 330 22:May-05:May
WALSUM_10 Amprion Konventionell positive 100 300 12:May-15:May
UW Höpfingen TransnetBW Erneuerbar negative 100 250 09:May-12:May
Lippendorf 50Hertz Konventionell negative 68 204 08:May-11:May
GUD_HERNE_6 Amprion Konventionell positive 168 168 15:May-16:May
BIBLIS_GT (bnBm) Amprion Konventionell positive 30 148 07:May-14:May
Börse TransnetBW Sonstiges positive 72 143 23:May-06:May
Leitzach Pool TenneT DE Sonstiges positive 67 134 16:May-18:May
illwerke vkw AG TransnetBW Sonstiges positive 72 107 09:May-17:May
NIEDERAUSSEM_H Amprion Konventionell negative 100 100 22:May-23:May
WALSUM_10 Amprion Konventionell negative 100 100 22:May-23:May
UW Dörpen-West TenneT DE Erneuerbar negative 46 93 14:May-16:May
Itzehoe TenneT DE Konventionell positive 88 88 22:May-23:May
UW Emden-Ost TenneT DE Erneuerbar negative 42 84 22:May-02:May
GUD_HERNE_6 Amprion Konventionell negative 31 78 07:May-10:May
illwerke vkw AG TransnetBW Sonstiges positive 70 70 11:May-12:May
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 28 70 12:May-14:May
WEISWEILER_H Amprion Konventionell positive 52 65 08:May-10:May
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 37 47 12:May-13:May
Börse TransnetBW Sonstiges positive 88 44 21:May-22:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 88 44 21:May-22:May
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 24 42 10:May-12:May
Eltmann TenneT DE Konventionell positive 31 31 22:May-23:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 50 12 21:May-22:May
illwerke vkw AG TransnetBW Sonstiges negative 35 9 12:May-12:May
Börse TenneT DE Sonstiges negative 25 6 12:May-12:May
Börse 50Hertz Sonstiges negative 21 5 22:May-23:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.24M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-11?

On 2026-05-11, estimated redispatch costs were approximately €0.8 million. This includes €0.28M for renewable curtailment compensation and €0.38M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-11?

The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 1,885 MWh of negative redispatch.

What was the electricity spot price on 2026-05-11?

The EPEX Day-Ahead spot price for DE_LU ranged from 91 to 174 €/MWh with an average of 118 €/MWh.