2,550MWh Curtailed
1,571MWh Ramped Up
€0.56MEst. Cost
128 MWPeak Positive
Day-Ahead Spot: -57-149 €/MWh (avg 67)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 4 | 7,503 |
| 50Hertz | negative | 1 | 85 |
| TenneT DE | positive | 1 | 58 |
| 50Hertz | positive | 1 | 10 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | negative | 394 | 3,153 | 07:May-15:May |
| AVA Cluster Voslapp | TenneT DE | negative | 194 | 1,550 | 11:May-19:May | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,400 | 08:May-15:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,400 | 08:May-15:May | |
| Börse | 50Hertz | Sonstiges | negative | 13 | 85 | 07:May-15:May |
| Börse | TenneT DE | Sonstiges | positive | 116 | 58 | 03:May-03:May |
| Börse | 50Hertz | Sonstiges | positive | 42 | 10 | 15:May-16:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-10?
On 2026-05-10, estimated redispatch costs were approximately €0.56 million. This includes €0.26M for renewable curtailment compensation and €0.15M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-10?
The most affected plant was Börse (TenneT DE) with 3,153 MWh of negative redispatch.
What was the electricity spot price on 2026-05-10?
The EPEX Day-Ahead spot price for DE_LU ranged from -57 to 149 €/MWh with an average of 67 €/MWh.