2,638MWh Curtailed
1,873MWh Ramped Up
€0.62MEst. Cost
147 MWPeak Positive
Day-Ahead Spot: -14-156 €/MWh (avg 84)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 1 | 1,884 |
| Amprion | positive | 1 | 148 |
| TenneT DE | positive | 1 | 100 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | negative | 314 | 1,884 | 08:May-14:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 30 | 148 | 07:May-14:May |
| Börse | TenneT DE | Sonstiges | positive | 80 | 100 | 03:May-04:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-09?
On 2026-05-09, estimated redispatch costs were approximately €0.62 million. This includes €0.26M for renewable curtailment compensation and €0.21M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-09?
The most affected plant was Börse (TenneT DE) with 1,884 MWh of negative redispatch.
What was the electricity spot price on 2026-05-09?
The EPEX Day-Ahead spot price for DE_LU ranged from -14 to 156 €/MWh with an average of 84 €/MWh.