2,738MWh Curtailed
2,477MWh Ramped Up
€0.78MEst. Cost
150 MWPeak Positive
Day-Ahead Spot: 27-167 €/MWh (avg 110)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 3 | 2,400 |
| TenneT DE | positive | 1 | 1,545 |
| 50Hertz | negative | 1 | 220 |
| TransnetBW | positive | 2 | 203 |
| Amprion | positive | 1 | 174 |
| TransnetBW | negative | 1 | 3 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 269 | 1,545 | 02:May-19:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,200 | 09:May-15:May | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 600 | 09:May-15:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 600 | 09:May-15:May | |
| 50H_EDIS_CR_LHG | 50Hertz | negative | 63 | 220 | 09:May-13:May | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 100 | 200 | 17:May-19:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 29 | 174 | 07:May-15:May |
| Börse | TransnetBW | Sonstiges | negative | 3 | 3 | 09:May-10:May |
| Grosskraftwerk Mannheim Block 7 | TransnetBW | Konventionell | positive | 3 | 3 | 09:May-10:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-08?
On 2026-05-08, estimated redispatch costs were approximately €0.78 million. This includes €0.27M for renewable curtailment compensation and €0.35M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-08?
The most affected plant was Börse (TenneT DE) with 1,545 MWh of positive redispatch.
What was the electricity spot price on 2026-05-08?
The EPEX Day-Ahead spot price for DE_LU ranged from 27 to 167 €/MWh with an average of 110 €/MWh.