3,203MWh Curtailed
2,996MWh Ramped Up
€0.96MEst. Cost
217 MWPeak Positive
Day-Ahead Spot: 100-250 €/MWh (avg 138)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 2 | 1,491 |
| Amprion | positive | 2 | 1,070 |
| Amprion | negative | 2 | 1,045 |
| 50Hertz | negative | 4 | 608 |
| TenneT DE | negative | 1 | 188 |
| 50Hertz | positive | 2 | 48 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 307 | 1,304 | 16:May-22:May |
| Börse | Amprion | Konventionell | negative | 104 | 958 | 05:May-16:May |
| Netzreservekraftwerk VOELKLINGEN_HKV | Amprion | Konventionell | positive | 102 | 896 | 05:May-16:May |
| 50H_WEMA_CR_GOE | 50Hertz | negative | 80 | 440 | 08:May-14:May | |
| Robert Frank 4 GT (KapRes) | TenneT DE | Konventionell | positive | 29 | 188 | 06:May-12:May |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 29 | 188 | 06:May-12:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 29 | 174 | 07:May-15:May |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 80 | 120 | 09:May-11:May | |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 29 | 87 | 12:May-15:May |
| Ahrensfelde C (KapRes) | 50Hertz | Konventionell | positive | 19 | 38 | 06:May-08:May |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 19 | 38 | 06:May-08:May |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 5 | 10 | 06:May-08:May |
| Börse | 50Hertz | Sonstiges | positive | 5 | 10 | 06:May-08:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-07?
On 2026-05-07, estimated redispatch costs were approximately €0.96 million. This includes €0.32M for renewable curtailment compensation and €0.5M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-07?
The most affected plant was Börse (TenneT DE) with 1,304 MWh of positive redispatch.
What was the electricity spot price on 2026-05-07?
The EPEX Day-Ahead spot price for DE_LU ranged from 100 to 250 €/MWh with an average of 138 €/MWh.