2,905MWh Curtailed
2,939MWh Ramped Up
€0.95MEst. Cost
171 MWPeak Positive
Day-Ahead Spot: 72-178 €/MWh (avg 121)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 3 | 2,212 |
| Amprion | positive | 6 | 1,834 |
| 50Hertz | negative | 4 | 1,682 |
| TenneT DE | positive | 2 | 250 |
| 50Hertz | positive | 2 | 172 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 300 | 1,275 | 08:May-13:May | |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 179 | 852 | 10:May-15:May |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 251 | 815 | 10:May-14:May |
| AVA Cluster Voslapp | TenneT DE | negative | 250 | 750 | 15:May-18:May | |
| WEISWEILER_G | Amprion | Konventionell | positive | 183 | 550 | 11:May-14:May |
| 50H OWP Baltic 1+2 | 50Hertz | negative | 128 | 415 | 10:May-14:May | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 135 | 271 | 10:May-12:May | |
| Robert Frank 4 GT (KapRes) | TenneT DE | Konventionell | positive | 29 | 188 | 06:May-12:May |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 29 | 188 | 06:May-12:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 85 | 170 | 12:May-14:May |
| Börse | 50Hertz | Sonstiges | positive | 110 | 165 | 14:May-15:May |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 76 | 152 | 11:May-13:May |
| 50H OWP Arkona | 50Hertz | negative | 52 | 144 | 11:May-13:May | |
| GUD_HERNE_6 | Amprion | Konventionell | positive | 81 | 122 | 12:May-14:May |
| Börse | TenneT DE | Sonstiges | positive | 248 | 62 | 04:May-05:May |
| WEISWEILER_H | Amprion | Konventionell | positive | 50 | 25 | 12:May-12:May |
| Börse | 50Hertz | Sonstiges | positive | 14 | 7 | 12:May-16:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-06?
On 2026-05-06, estimated redispatch costs were approximately €0.95 million. This includes €0.29M for renewable curtailment compensation and €0.44M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-06?
The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 1,275 MWh of negative redispatch.
What was the electricity spot price on 2026-05-06?
The EPEX Day-Ahead spot price for DE_LU ranged from 72 to 178 €/MWh with an average of 121 €/MWh.