2,905MWh Curtailed
2,939MWh Ramped Up
€0.95MEst. Cost
171 MWPeak Positive

Day-Ahead Spot: 72-178 €/MWh (avg 121)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 3 2,212
Amprion positive 6 1,834
50Hertz negative 4 1,682
TenneT DE positive 2 250
50Hertz positive 2 172

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 1,275 08:May-13:May
Rostock Kohlekraftwerk 50Hertz Konventionell negative 179 852 10:May-15:May
LAUSWARD_GUDF Amprion Konventionell positive 251 815 10:May-14:May
AVA Cluster Voslapp TenneT DE Erneuerbar negative 250 750 15:May-18:May
WEISWEILER_G Amprion Konventionell positive 183 550 11:May-14:May
50H OWP Baltic 1+2 50Hertz Erneuerbar negative 128 415 10:May-14:May
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 135 271 10:May-12:May
Robert Frank 4 GT (KapRes) TenneT DE Konventionell positive 29 188 06:May-12:May
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 29 188 06:May-12:May
BIBLIS_GT (bnBm) Amprion Konventionell positive 85 170 12:May-14:May
Börse 50Hertz Sonstiges positive 110 165 14:May-15:May
NIEHL-31-GUD Amprion Konventionell positive 76 152 11:May-13:May
50H OWP Arkona 50Hertz Erneuerbar negative 52 144 11:May-13:May
GUD_HERNE_6 Amprion Konventionell positive 81 122 12:May-14:May
Börse TenneT DE Sonstiges positive 248 62 04:May-05:May
WEISWEILER_H Amprion Konventionell positive 50 25 12:May-12:May
Börse 50Hertz Sonstiges positive 14 7 12:May-16:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.29M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-06?

On 2026-05-06, estimated redispatch costs were approximately €0.95 million. This includes €0.29M for renewable curtailment compensation and €0.44M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-06?

The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 1,275 MWh of negative redispatch.

What was the electricity spot price on 2026-05-06?

The EPEX Day-Ahead spot price for DE_LU ranged from 72 to 178 €/MWh with an average of 121 €/MWh.