2,929MWh Curtailed
2,866MWh Ramped Up
€0.83MEst. Cost
160 MWPeak Positive
Day-Ahead Spot: 87-202 €/MWh (avg 131)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 3 | 3,000 |
| TenneT DE | positive | 2 | 1,858 |
| TransnetBW | positive | 2 | 999 |
| Amprion | positive | 2 | 635 |
| 50Hertz | negative | 1 | 221 |
| Amprion | negative | 1 | 145 |
| TransnetBW | negative | 1 | 20 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Irsching 6 (bnBm) | TenneT DE | Konventionell | positive | 205 | 1,638 | 05:May-13:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,200 | 08:May-14:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,200 | 08:May-14:May | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 600 | 08:May-14:May | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 95 | 568 | 08:May-14:May |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 78 | 490 | 08:May-14:May |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 115 | 431 | 09:May-13:May |
| Lippendorf | 50Hertz | Konventionell | negative | 34 | 221 | 06:May-12:May |
| Robert Frank 4 GT (KapRes) | TenneT DE | Konventionell | positive | 34 | 221 | 06:May-12:May |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 26 | 145 | 07:May-14:May |
| CHEMIEPARK_MARL_KRAFTWERKE | Amprion | Konventionell | negative | 26 | 145 | 07:May-14:May |
| Börse | TransnetBW | Sonstiges | negative | 78 | 20 | 14:May-14:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.25M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-05?
On 2026-05-05, estimated redispatch costs were approximately €0.83 million. This includes €0.29M for renewable curtailment compensation and €0.46M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-05?
The most affected plant was Irsching 6 (bnBm) (TenneT DE) with 1,638 MWh of positive redispatch.
What was the electricity spot price on 2026-05-05?
The EPEX Day-Ahead spot price for DE_LU ranged from 87 to 202 €/MWh with an average of 131 €/MWh.