1,127MWh Curtailed
119MWh Ramped Up
€0.4MEst. Cost
103 MWPeak Positive

Day-Ahead Spot: -80-89 €/MWh (avg 12)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 11 16,734
Amprion positive 9 11,549
TenneT DE positive 7 6,355
50Hertz negative 9 3,097
50Hertz positive 2 1,935
TransnetBW positive 2 73

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 295 3,538 22:April-10:April
ReserveKW Zolling 5 TenneT DE Konventionell positive 331 3,478 22:April-08:April
Börse TenneT DE Sonstiges negative 331 3,478 22:April-08:April
UW Diele TenneT DE Erneuerbar negative 296 3,108 04:April-22:April
Knapsack 1 Amprion Konventionell positive 393 2,556 15:April-22:April
UW Dörpen-West TenneT DE Erneuerbar negative 403 2,420 22:April-04:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 296 2,366 04:April-14:April
Emsland Block C Amprion Konventionell positive 244 1,954 22:April-06:April
UW Dörpen-West TenneT DE Erneuerbar negative 272 1,902 15:April-22:April
Börse TenneT DE Sonstiges negative 214 1,715 14:April-22:April
ReserveKW Zolling 5 TenneT DE Konventionell positive 214 1,715 14:April-22:April
Schwarze Pumpe (Standort) 50Hertz Konventionell positive 223 1,560 07:April-14:April
UW Büttel TenneT DE Erneuerbar negative 230 1,498 15:April-22:April
AVA Cluster Voslapp TenneT DE Erneuerbar negative 170 1,362 22:April-06:April
Emsland Block C Amprion Konventionell positive 195 1,265 15:April-22:April
NIEDERAUSSEM_K Amprion Konventionell positive 193 1,060 16:April-22:April
UW Diele TenneT DE Erneuerbar negative 163 980 22:April-04:April
Börse TenneT DE Sonstiges positive 302 905 18:April-21:April
NEURATH_F Amprion Konventionell positive 99 496 17:April-22:April
NIEHL-31-GUD Amprion Konventionell positive 232 464 20:April-22:April
Jänschwalde (Standort) 50Hertz Konventionell positive 75 375 08:April-14:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 343 343 03:April-04:April
AVA Cluster Lehrte TenneT DE Erneuerbar negative 50 200 04:April-08:April
Braunschweig HKWM GT31 TenneT DE Konventionell positive 43 161 08:April-12:April
50H UW Bertikow 50Hertz Erneuerbar negative 21 119 04:April-12:April
Börse Amprion Konventionell positive 450 112 21:April-22:April
HKW BARMEN 1 Amprion Konventionell positive 26 104 18:April-22:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 72 90 07:April-09:April
Börse TransnetBW Sonstiges positive 136 68 22:April-22:April
UW Emden-Ost TenneT DE Erneuerbar negative 26 52 15:April-17:April
50H Rostock Marienehe 50Hertz Konventionell negative 12 48 18:April-22:April
50H UW Wessin 50Hertz Erneuerbar negative 19 42 04:April-12:April
50H UW Bertikow 50Hertz Erneuerbar negative 42 42 03:April-04:April
Börse TenneT DE Sonstiges positive 40 40 09:April-10:April
50H UW Wessin 50Hertz Erneuerbar negative 32 32 03:April-04:April
Braunschweig HKWN GT TenneT DE Konventionell positive 19 29 08:April-10:April
Braunschweig GT TenneT DE Konventionell positive 28 28 08:April-09:April
WP Emsland TenneT DE Erneuerbar negative 20 20 04:April-05:April
50H Berlin Marzahn 50Hertz Konventionell negative 8 15 18:April-20:April
Börse TransnetBW Sonstiges positive 4 4 10:April-15:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.12M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-05?

On 2026-04-05, estimated redispatch costs were approximately €0.4 million. This includes €0.11M for renewable curtailment compensation and €0M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-05?

The most affected plant was Netzreservekraftwerk BERGKAMEN_A (Amprion) with 3,538 MWh of positive redispatch.

What was the electricity spot price on 2026-04-05?

The EPEX Day-Ahead spot price for DE_LU ranged from -80 to 89 €/MWh with an average of 12 €/MWh.