← 2026-04-05

Monday, April 6, 2026

2026-04-07 →
1,945MWh Curtailed
965MWh Ramped Up
€0.56MEst. Cost
220 MWPeak Positive

Day-Ahead Spot: -90-166 €/MWh (avg 48)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 2 3,770
TenneT DE negative 3 3,085
50Hertz negative 6 1,503
TransnetBW negative 1 0

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 726 2,903 17:April-21:April
UW Diele TenneT DE Erneuerbar negative 340 2,038 04:April-10:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 131 1,212 01:April-18:April
Niederrad 1 TenneT DE Konventionell positive 36 867 22:April-22:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 638 09:April-14:April
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 50 410 22:April-06:April
50H UW Bertikow 50Hertz Erneuerbar negative 17 100 04:April-10:April
50H_EDIS_CR_GUE_Nord 50Hertz Erneuerbar negative 75 75 16:April-17:April
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 45 56 15:April-17:April
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 50 38 08:April-09:April
50H Berlin Marzahn 50Hertz Konventionell negative 11 22 08:April-10:April
Börse TransnetBW Sonstiges negative 1 0 09:April-10:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-06?

On 2026-04-06, estimated redispatch costs were approximately €0.56 million. This includes €0.19M for renewable curtailment compensation and €0.08M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-06?

The most affected plant was Börse (TenneT DE) with 2,903 MWh of positive redispatch.

What was the electricity spot price on 2026-04-06?

The EPEX Day-Ahead spot price for DE_LU ranged from -90 to 166 €/MWh with an average of 48 €/MWh.