2,783MWh Curtailed
2,639MWh Ramped Up
€0.7MEst. Cost
141 MWPeak Positive
Day-Ahead Spot: 94-159 €/MWh (avg 125)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 4 | 6,432 |
| Amprion | positive | 4 | 3,091 |
| TenneT DE | negative | 3 | 2,388 |
| Amprion | negative | 6 | 1,924 |
| TransnetBW | positive | 3 | 409 |
| TransnetBW | negative | 1 | 175 |
| 50Hertz | negative | 1 | 40 |
| 50Hertz | positive | 1 | 3 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 350 | 4,901 | 05:February-23:February |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 160 | 2,233 | 05:February-21:February |
| Emsland Block C | Amprion | Konventionell | positive | 205 | 2,047 | 05:February-21:February |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 199 | 1,390 | 01:February-08:February |
| Emsland Block C | Amprion | Konventionell | positive | 190 | 950 | 03:February-08:February |
| NEURATH_F | Amprion | Konventionell | negative | 112 | 449 | 03:February-07:February |
| Knapsack 1 | Amprion | Konventionell | negative | 282 | 423 | 04:February-06:February |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 107 | 322 | 04:February-07:February |
| HAMMUENTROP_10 | Amprion | Konventionell | negative | 128 | 256 | 04:February-17:February |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 239 | 239 | 05:February-06:February |
| KNAPSACK_20 | Amprion | Konventionell | negative | 157 | 235 | 04:February-06:February |
| Reservekraftwerk Marbach GT 3 | TransnetBW | Konventionell | positive | 68 | 205 | 04:February-07:February |
| Börse | TransnetBW | Sonstiges | negative | 63 | 175 | 01:February-21:February |
| Börse | TransnetBW | Sonstiges | positive | 68 | 136 | 04:February-16:February |
| Irsching 5 | TenneT DE | Konventionell | negative | 105 | 105 | 07:February-08:February |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 70 | 88 | 05:February-06:February |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 85 | 85 | 05:February-06:February |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 68 | 68 | 16:February-21:February |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 43 | 53 | 04:February-06:February |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 50 | 50 | 07:February-08:February |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | negative | 40 | 40 | 09:February-10:February |
| KMW_KW5 | Amprion | Konventionell | positive | 9 | 9 | 05:February-06:February |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | positive | 2 | 3 | 05:February-14:February |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-02-06?
On 2026-02-06, estimated redispatch costs were approximately €0.7 million. This includes €0.28M for renewable curtailment compensation and €0.41M for conventional ramp-up costs.
Which power plants were most affected on 2026-02-06?
The most affected plant was Börse (TenneT DE) with 4,901 MWh of positive redispatch.
What was the electricity spot price on 2026-02-06?
The EPEX Day-Ahead spot price for DE_LU ranged from 94 to 159 €/MWh with an average of 125 €/MWh.