← 2026-02-05

Friday, February 6, 2026

2026-02-07 →
2,783MWh Curtailed
2,639MWh Ramped Up
€0.7MEst. Cost
141 MWPeak Positive

Day-Ahead Spot: 94-159 €/MWh (avg 125)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 4 6,432
Amprion positive 4 3,091
TenneT DE negative 3 2,388
Amprion negative 6 1,924
TransnetBW positive 3 409
TransnetBW negative 1 175
50Hertz negative 1 40
50Hertz positive 1 3

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 350 4,901 05:February-23:February
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 160 2,233 05:February-21:February
Emsland Block C Amprion Konventionell positive 205 2,047 05:February-21:February
ReserveKW Staudinger 5 TenneT DE Konventionell positive 199 1,390 01:February-08:February
Emsland Block C Amprion Konventionell positive 190 950 03:February-08:February
NEURATH_F Amprion Konventionell negative 112 449 03:February-07:February
Knapsack 1 Amprion Konventionell negative 282 423 04:February-06:February
NIEDERAUSSEM_K Amprion Konventionell negative 107 322 04:February-07:February
HAMMUENTROP_10 Amprion Konventionell negative 128 256 04:February-17:February
NIEHL-31-GUD Amprion Konventionell negative 239 239 05:February-06:February
KNAPSACK_20 Amprion Konventionell negative 157 235 04:February-06:February
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 68 205 04:February-07:February
Börse TransnetBW Sonstiges negative 63 175 01:February-21:February
Börse TransnetBW Sonstiges positive 68 136 04:February-16:February
Irsching 5 TenneT DE Konventionell negative 105 105 07:February-08:February
ReserveKW Staudinger 5 TenneT DE Konventionell positive 70 88 05:February-06:February
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 85 85 05:February-06:February
illwerke vkw AG TransnetBW Sonstiges positive 68 68 16:February-21:February
SW München KW-Pool TenneT DE Sonstiges positive 43 53 04:February-06:February
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 50 50 07:February-08:February
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 40 40 09:February-10:February
KMW_KW5 Amprion Konventionell positive 9 9 05:February-06:February
50H Erfurt-Ost HKW GuD 50Hertz Konventionell positive 2 3 05:February-14:February

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-02-06?

On 2026-02-06, estimated redispatch costs were approximately €0.7 million. This includes €0.28M for renewable curtailment compensation and €0.41M for conventional ramp-up costs.

Which power plants were most affected on 2026-02-06?

The most affected plant was Börse (TenneT DE) with 4,901 MWh of positive redispatch.

What was the electricity spot price on 2026-02-06?

The EPEX Day-Ahead spot price for DE_LU ranged from 94 to 159 €/MWh with an average of 125 €/MWh.