3,175MWh Curtailed
3,263MWh Ramped Up
€1.04MEst. Cost
189 MWPeak Positive
Day-Ahead Spot: 100-188 €/MWh (avg 137)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 10 | 33,813 |
| TenneT DE | positive | 6 | 29,173 |
| TransnetBW | positive | 16 | 19,386 |
| Amprion | positive | 9 | 12,085 |
| 50Hertz | negative | 14 | 3,699 |
| Amprion | negative | 7 | 3,053 |
| 50Hertz | positive | 3 | 1,611 |
| TransnetBW | negative | 1 | 52 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 1095 | 26,288 | 23:January-23:January |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 652 | 15,648 | 23:January-23:January |
| UW Büttel | TenneT DE | negative | 629 | 11,329 | 05:January-23:January | |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 278 | 6,398 | 23:January-22:January |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 265 | 4,498 | 06:January-23:January |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 341 | 4,175 | 08:January-21:January |
| Netzreservekraftwerk BERGKAMEN_A | Amprion | Konventionell | positive | 287 | 2,510 | 03:January-12:January |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 275 | 2,478 | 23:January-08:January |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 154 | 2,314 | 04:January-23:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 101 | 1,723 | 23:January-22:January |
| ReserveKW Ingolstadt 3 | TenneT DE | Konventionell | positive | 106 | 1,586 | 08:January-23:January |
| UW Dörpen-West | TenneT DE | negative | 309 | 1,543 | 05:January-10:January | |
| Schkopau | 50Hertz | Konventionell | positive | 168 | 1,509 | 23:January-23:January |
| Irsching 5 | TenneT DE | Konventionell | negative | 260 | 1,494 | 17:January-23:January |
| UW Büttel | TenneT DE | negative | 322 | 1,450 | 03:January-07:January | |
| UW Büttel | TenneT DE | negative | 240 | 1,441 | 23:January-05:January | |
| GERSTEINW_F (KapRes) | Amprion | Konventionell | positive | 191 | 1,434 | 12:January-20:January |
| Emsland Block B | Amprion | Konventionell | positive | 129 | 1,418 | 09:January-21:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 91 | 1,272 | 09:January-23:January |
| Emsland Block D | Amprion | Konventionell | positive | 500 | 1,126 | 20:January-23:January |
| HAMMUENTROP_10 | Amprion | Konventionell | negative | 182 | 1,090 | 17:January-23:January |
| Emsland Block C | Amprion | Konventionell | positive | 187 | 934 | 12:January-23:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 340 | 850 | 05:January-07:January |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 125 | 749 | 17:January-23:January |
| ReserveKW Ingolstadt 3 | TenneT DE | Konventionell | positive | 70 | 703 | 11:January-23:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 100 | 673 | 06:January-20:January |
| WALSUM_10 | Amprion | Konventionell | negative | 246 | 614 | 17:January-19:January |
| Irsching 5 | TenneT DE | Konventionell | negative | 201 | 603 | 05:January-08:January |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 84 | 501 | 03:January-23:January |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 162 | 325 | 05:January-07:January |
| Gebersdorf 1 | TenneT DE | Konventionell | positive | 148 | 295 | 03:January-05:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 86 | 281 | 23:January-05:January |
| WALSUM_10 | Amprion | Konventionell | negative | 167 | 250 | 03:January-05:January |
| Gebersdorf 1 | TenneT DE | Konventionell | positive | 94 | 210 | 06:January-08:January |
| Börse | TransnetBW | Sonstiges | positive | 105 | 210 | 00:January-20:January |
| KMW_KW5 | Amprion | Konventionell | positive | 56 | 208 | 03:January-06:January |
| Emsland Block D | Amprion | Konventionell | negative | 50 | 200 | 17:January-21:January |
| Reservekraftwerk Altbach/Deizisau Block 1 | TransnetBW | Konventionell | positive | 94 | 188 | 03:January-05:January |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 57 | 170 | 04:January-09:January |
| WALSUM_10 | Amprion | Konventionell | positive | 162 | 162 | 17:January-18:January |
| Schkopau | 50Hertz | Konventionell | negative | 80 | 160 | 21:January-23:January |
| 50H Rostock Marienehe | 50Hertz | Konventionell | negative | 40 | 160 | 05:January-23:January |
| Irsching 5 | TenneT DE | Konventionell | negative | 157 | 157 | 08:January-09:January |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 63 | 142 | 20:January-23:January |
| Emsland Block C | Amprion | Konventionell | positive | 118 | 118 | 05:January-06:January |
| Kraftwerk Walheim GT D | TransnetBW | Konventionell | positive | 117 | 117 | 14:January-15:January |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 65 | 114 | 21:January-23:January |
| UW Büttel | TenneT DE | negative | 30 | 112 | 00:January-06:January | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 34 | 102 | 08:January-11:January |
| Grosskraftwerk Mannheim Block 8 | TransnetBW | Konventionell | positive | 50 | 100 | 03:January-05:January |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.31M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-01-28?
On 2026-01-28, estimated redispatch costs were approximately €1.04 million. This includes €0.32M for renewable curtailment compensation and €0.54M for conventional ramp-up costs.
Which power plants were most affected on 2026-01-28?
The most affected plant was Börse (TenneT DE) with 26,288 MWh of positive redispatch.
What was the electricity spot price on 2026-01-28?
The EPEX Day-Ahead spot price for DE_LU ranged from 100 to 188 €/MWh with an average of 137 €/MWh.