4,389MWh Curtailed
7,117MWh Ramped Up
€3MEst. Cost
472 MWPeak Positive

Day-Ahead Spot: 230-574 €/MWh (avg 315)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion negative 7 4,046
TenneT DE positive 6 1,396
50Hertz negative 2 279
TenneT DE negative 3 264
TransnetBW positive 1 86
50Hertz positive 1 29
TransnetBW negative 1 25

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
WEISWEILER_G Amprion Konventionell negative 151 1,207 07:October-15:October
WEISWEILER_G Amprion Konventionell negative 203 1,065 01:October-06:October
WEISWEILER_H Amprion Konventionell negative 200 750 00:October-04:October
Gebersdorf 1 TenneT DE Konventionell positive 90 718 23:October-07:October
WEISWEILER_G Amprion Konventionell negative 89 715 23:October-07:October
50H_TEN_CR_M2_VIB 50Hertz Erneuerbar negative 125 250 09:October-11:October
Irsching 4 TenneT DE Konventionell negative 40 237 07:October-13:October
ReserveKW Plattling TenneT DE Konventionell positive 29 221 01:October-09:October
Gebersdorf 1 TenneT DE Konventionell positive 80 220 20:October-23:October
WEISWEILER_G Amprion Konventionell negative 80 220 20:October-23:October
Frankfurt West 4 TenneT DE Konventionell positive 60 180 10:October-13:October
Börse TransnetBW Sonstiges positive 69 86 01:October-15:October
Knapsack 1 Amprion Konventionell negative 66 50 05:October-06:October
Frankfurt West 5 TenneT DE Konventionell positive 15 45 07:October-10:October
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 26 39 04:October-06:October
Boxberg (Standort) 50Hertz Konventionell negative 14 29 06:October-08:October
Thyrow A (SysRel) 50Hertz Konventionell positive 14 29 06:October-08:October
Börse TransnetBW Sonstiges negative 33 25 01:October-15:October
Irsching 5 TenneT DE Konventionell negative 25 25 08:October-09:October
Frankfurt West 3 TenneT DE Konventionell positive 6 12 08:October-10:October
Börse TenneT DE Sonstiges negative 10 2 23:October-23:October

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.9M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-10-29?

On 2026-10-29, estimated redispatch costs were approximately €3 million. This includes €0.44M for renewable curtailment compensation and €2.46M for conventional ramp-up costs.

Which power plants were most affected on 2026-10-29?

The most affected plant was WEISWEILER_G (Amprion) with 1,207 MWh of negative redispatch.

What was the electricity spot price on 2026-10-29?

The EPEX Day-Ahead spot price for DE_LU ranged from 230 to 574 €/MWh with an average of 315 €/MWh.