Frankfurt West 5
Konventionell • TenneT DE
461Total MWh
4Measures
20 MWAvg Power
0Curtailments
4Ramp-ups
Data: 2026-10-22 to 2026-10-29
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-10-29 | 1 | 45 |
| 2026-10-28 | 1 | 40 |
| 2026-10-26 | 1 | 204 |
| 2026-10-22 | 1 | 172 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-10-29 | TenneT DE | positive | 15 | 45 | 07:October-10:October |
| 2026-10-28 | TenneT DE | positive | 20 | 40 | 17:October-19:October |
| 2026-10-26 | TenneT DE | positive | 20 | 204 | 05:October-15:October |
| 2026-10-22 | TenneT DE | positive | 24 | 172 | 07:October-15:October |
Frequently Asked Questions
What is the redispatch history of Frankfurt West 5?
Frankfurt West 5 is a Konventionell power plant in the TenneT DE grid zone. It has received 4 redispatch instructions totaling 461 MWh since 2026-10-22.
Why is Frankfurt West 5 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.