3,012MWh Curtailed
3,649MWh Ramped Up
€1.23MEst. Cost
251 MWPeak Positive
Day-Ahead Spot: 2-251 €/MWh (avg 149)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| 50Hertz | negative | 29 | 10,784 |
| Amprion | positive | 7 | 3,370 |
| TenneT DE | negative | 6 | 3,277 |
| TenneT DE | positive | 8 | 1,064 |
| TransnetBW | positive | 3 | 507 |
| Amprion | negative | 1 | 340 |
| 50Hertz | positive | 2 | 195 |
| TransnetBW | negative | 1 | 46 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 400 | 2,000 | 08:September-13:September | |
| Emsland Block D | Amprion | Konventionell | positive | 246 | 1,845 | 07:September-15:September |
| 50H PV Witznitz | 50Hertz | negative | 239 | 1,255 | 08:September-14:September | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 263 | 1,182 | 07:September-12:September | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 138 | 792 | 06:September-12:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 202 | 756 | 06:September-15:September |
| 50H_AVA_CR_STW | 50Hertz | negative | 176 | 703 | 08:September-12:September | |
| 50H_AVA_CR_FOE | 50Hertz | negative | 158 | 553 | 08:September-12:September | |
| KMW_KW3 | Amprion | Konventionell | positive | 209 | 522 | 06:September-09:September |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 500 | 08:September-13:September | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 500 | 08:September-13:September | |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 164 | 450 | 09:September-12:September | |
| 50H OWP Wikinger | 50Hertz | negative | 106 | 425 | 08:September-12:September | |
| 50H OWP Windanker | 50Hertz | negative | 103 | 412 | 08:September-12:September | |
| 50H_TEN_CR_M2_VIB | 50Hertz | negative | 232 | 406 | 10:September-12:September | |
| 50H_MNS_CR_KLM | 50Hertz | negative | 180 | 406 | 08:September-11:September | |
| NIEHL-II | Amprion | Konventionell | positive | 160 | 399 | 07:September-09:September |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 92 | 367 | 08:September-12:September | |
| Datteln_4 | Amprion | Konventionell | negative | 170 | 340 | 13:September-15:September |
| 50H_MNS_CR_LAU_Nord | 50Hertz | negative | 146 | 328 | 08:September-11:September | |
| 50H_MNS_CR_JSN | 50Hertz | negative | 139 | 314 | 08:September-11:September | |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 56 | 306 | 06:September-12:September |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 100 | 300 | 16:September-19:September |
| HUCKINGEN_A | Amprion | Konventionell | positive | 100 | 300 | 16:September-19:September |
| 50H_MNS_CR_MA_Nord | 50Hertz | negative | 132 | 296 | 08:September-11:September | |
| Lippendorf | 50Hertz | Konventionell | negative | 144 | 289 | 07:September-09:September |
| 50H OWP Arkona | 50Hertz | negative | 69 | 275 | 08:September-12:September | |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 88 | 262 | 09:September-12:September | |
| BAG NWAK-Cluster 04 Aschaffenburg | TenneT DE | negative | 50 | 250 | 08:September-13:September | |
| 50H_MNS_CR_ADB | 50Hertz | negative | 163 | 244 | 09:September-11:September | |
| 50H EE Bartow | 50Hertz | negative | 56 | 237 | 07:September-13:September | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 157 | 236 | 07:September-15:September |
| Braunschweig GT | TenneT DE | Konventionell | positive | 42 | 234 | 07:September-12:September |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 50 | 225 | 07:September-11:September |
| 50H_MNS_CR_LAU_Sued | 50Hertz | negative | 90 | 202 | 08:September-11:September | |
| 50H_MNS_CR_MA_Sued | 50Hertz | negative | 86 | 194 | 08:September-11:September | |
| KNAPSACK_20 | Amprion | Konventionell | positive | 165 | 165 | 07:September-08:September |
| 50H Hamburg Wedel1 | 50Hertz | Konventionell | positive | 48 | 145 | 09:September-12:September |
| Grosskraftwerk Mannheim Block 9 | TransnetBW | Konventionell | positive | 94 | 140 | 08:September-09:September |
| Braunschweig HKWN GT | TenneT DE | Konventionell | positive | 20 | 108 | 06:September-12:September |
| Braunschweig DT | TenneT DE | Konventionell | positive | 15 | 85 | 06:September-12:September |
| Datteln_4 | Amprion | Konventionell | positive | 85 | 85 | 08:September-09:September |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 31 | 78 | 06:September-09:September |
| 50H_EDIS_CR_SOW_Nord | 50Hertz | negative | 40 | 70 | 09:September-11:September | |
| 50H UW Bertikow | 50Hertz | negative | 18 | 70 | 08:September-12:September | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 132 | 66 | 08:September-08:September |
| Börse | Amprion | Konventionell | positive | 215 | 54 | 08:September-08:September |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | positive | 50 | 50 | 10:September-11:September |
| Börse | TransnetBW | Sonstiges | negative | 23 | 46 | 06:September-12:September |
| 50H_EDIS_CR_LHG | 50Hertz | negative | 20 | 35 | 09:September-11:September |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.37M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-09-26?
On 2026-09-26, estimated redispatch costs were approximately €1.23 million. This includes €0.3M for renewable curtailment compensation and €0.65M for conventional ramp-up costs.
Which power plants were most affected on 2026-09-26?
The most affected plant was BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt (TenneT DE) with 2,000 MWh of negative redispatch.
What was the electricity spot price on 2026-09-26?
The EPEX Day-Ahead spot price for DE_LU ranged from 2 to 251 €/MWh with an average of 149 €/MWh.