2,047MWh Curtailed
2,576MWh Ramped Up
€0.74MEst. Cost
341 MWPeak Positive
Day-Ahead Spot: 0-252 €/MWh (avg 100)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 8 | 12,800 |
| 50Hertz | negative | 27 | 6,665 |
| Amprion | positive | 5 | 1,567 |
| TenneT DE | positive | 5 | 1,511 |
| TransnetBW | positive | 2 | 214 |
| TransnetBW | negative | 1 | 50 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 14 Schwandorf | TenneT DE | negative | 350 | 2,800 | 07:June-15:June | |
| BAG NWAK-Cluster 03 Bergrheinfeld-Schweinfurt | TenneT DE | negative | 350 | 2,450 | 07:June-14:June | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,000 | 07:June-15:June | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 200 | 1,600 | 07:June-15:June | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,600 | 07:June-15:June | |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 150 | 1,200 | 07:June-15:June | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | positive | 219 | 986 | 08:June-12:June |
| 50H_AVA_CR_STW | 50Hertz | negative | 246 | 800 | 08:June-11:June | |
| BAG NWAK-Cluster 13 Etzenricht | TenneT DE | negative | 100 | 800 | 07:June-15:June | |
| 50H_AVA_CR_WOL | 50Hertz | negative | 215 | 700 | 07:June-11:June | |
| WEISWEILER_H | Amprion | Konventionell | positive | 205 | 668 | 05:June-08:June |
| Datteln_4 | Amprion | Konventionell | positive | 164 | 655 | 07:June-11:June |
| 50H PV Witznitz | 50Hertz | negative | 110 | 607 | 07:June-13:June | |
| 50H PV Bartow | 50Hertz | negative | 137 | 549 | 08:June-12:June | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 182 | 546 | 05:June-08:June |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 239 | 478 | 06:June-08:June |
| 50H_AVA_CR_FOE | 50Hertz | negative | 142 | 462 | 07:June-11:June | |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 144 | 432 | 08:June-11:June | |
| BAG NWAK-Cluster 04 Aschaffenburg | TenneT DE | negative | 50 | 350 | 07:June-14:June | |
| 50H_MNS_CR_JSN | 50Hertz | negative | 141 | 318 | 09:June-11:June | |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 108 | 270 | 09:June-11:June | |
| Frankfurt West 4 | TenneT DE | Konventionell | positive | 60 | 240 | 07:June-11:June |
| 50H_EDIS_CR_PE | 50Hertz | negative | 94 | 212 | 09:June-11:June | |
| 50H OWP Arkona | 50Hertz | negative | 51 | 205 | 08:June-12:June | |
| 50H OWP Baltic Eagle | 50Hertz | negative | 51 | 203 | 08:June-12:June | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 83 | 166 | 06:June-08:June |
| Börse | TransnetBW | Sonstiges | positive | 36 | 144 | 05:June-13:June |
| NIEDERAUSSEM_K | Amprion | Konventionell | positive | 58 | 144 | 07:June-10:June |
| Itzehoe | TenneT DE | Konventionell | positive | 25 | 118 | 08:June-13:June |
| 50H OWP Wikinger | 50Hertz | negative | 28 | 114 | 08:June-12:June | |
| 50H_MNS_CR_KLM | 50Hertz | negative | 100 | 100 | 09:June-10:June | |
| 50H_MNS_CR_LAU_Sued | 50Hertz | negative | 90 | 90 | 09:June-10:June | |
| 50H_EDIS_CR_LHG | 50Hertz | negative | 44 | 89 | 08:June-10:June | |
| 50H_EDIS_CR_HND | 50Hertz | negative | 20 | 85 | 09:June-13:June | |
| 50H_EDIS_CR_SOW_Nord | 50Hertz | negative | 38 | 76 | 08:June-10:June | |
| 50H UW Bertikow | 50Hertz | negative | 15 | 75 | 08:June-13:June | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 138 | 69 | 06:June-06:June |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 58 | 58 | 07:June-08:June |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 13 | 51 | 08:June-12:June | |
| KMW_KW5 | Amprion | Konventionell | positive | 17 | 50 | 05:June-08:June |
| WEISWEILER_H | Amprion | Konventionell | positive | 33 | 50 | 07:June-10:June |
| Börse | TransnetBW | Sonstiges | negative | 99 | 50 | 12:June-12:June |
| 50H_WEMA_CR_PE | 50Hertz | negative | 50 | 38 | 09:June-10:June | |
| 50H_WEMA_CR_PMS | 50Hertz | negative | 50 | 38 | 09:June-10:June | |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 34 | 34 | 07:June-08:June |
| CROC Cluster Parchim Süd | 50Hertz | Sonstiges | negative | 50 | 25 | 09:June-10:June |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 2 | 10 | 07:June-11:June |
| Börse | TenneT DE | Sonstiges | positive | 5 | 1 | 09:June-09:June |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-06-27?
On 2026-06-27, estimated redispatch costs were approximately €0.74 million. This includes €0.2M for renewable curtailment compensation and €0.33M for conventional ramp-up costs.
Which power plants were most affected on 2026-06-27?
The most affected plant was BAG NWAK-Cluster 14 Schwandorf (TenneT DE) with 2,800 MWh of negative redispatch.
What was the electricity spot price on 2026-06-27?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 252 €/MWh with an average of 100 €/MWh.