4,747MWh Curtailed
5,804MWh Ramped Up
€2.2MEst. Cost
322 MWPeak Positive
Day-Ahead Spot: 206-322 €/MWh (avg 242)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | negative | 6 | 5,116 |
| TenneT DE | negative | 4 | 1,860 |
| TenneT DE | positive | 4 | 1,751 |
| Amprion | positive | 3 | 392 |
| 50Hertz | positive | 1 | 310 |
| TransnetBW | positive | 2 | 295 |
| TransnetBW | negative | 2 | 72 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Knapsack 1 | Amprion | Konventionell | negative | 231 | 1,846 | 23:November-07:November |
| Gebersdorf 2 | TenneT DE | Konventionell | positive | 227 | 1,533 | 23:November-05:November |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 233 | 1,454 | 23:November-05:November |
| NIEHL-II | Amprion | Konventionell | negative | 180 | 1,124 | 23:November-05:November |
| Irsching 4 | TenneT DE | Konventionell | negative | 146 | 912 | 23:November-05:November |
| Irsching 5 | TenneT DE | Konventionell | negative | 146 | 912 | 23:November-05:November |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 216 | 486 | 23:November-01:November |
| Schkopau | 50Hertz | Konventionell | positive | 52 | 310 | 23:November-05:November |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 69 | 260 | 23:November-05:November |
| Knapsack 1 | Amprion | Konventionell | positive | 126 | 221 | 23:November-00:November |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 78 | 156 | 23:November-01:November |
| Frankfurt West 4 | TenneT DE | Konventionell | positive | 60 | 120 | 23:November-01:November |
| NIEDERAUSSEM_G | Amprion | Konventionell | positive | 69 | 120 | 23:November-00:November |
| Börse | TransnetBW | Sonstiges | negative | 34 | 69 | 23:November-06:November |
| Gebersdorf 2 | TenneT DE | Konventionell | positive | 53 | 53 | 22:November-23:November |
| KMW_KW5 | Amprion | Konventionell | positive | 17 | 51 | 23:November-02:November |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 50 | 50 | 22:November-23:November |
| Obernburg | TenneT DE | Konventionell | positive | 15 | 45 | 23:November-02:November |
| Börse | TransnetBW | Sonstiges | positive | 140 | 35 | 22:November-23:November |
| Irsching 4 | TenneT DE | Konventionell | negative | 70 | 18 | 22:November-23:November |
| Irsching 5 | TenneT DE | Konventionell | negative | 70 | 18 | 22:November-23:November |
| Börse | TransnetBW | Sonstiges | negative | 13 | 3 | 22:November-22:November |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.66M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-11-08?
On 2026-11-08, estimated redispatch costs were approximately €2.2 million. This includes €0.47M for renewable curtailment compensation and €1.58M for conventional ramp-up costs.
Which power plants were most affected on 2026-11-08?
The most affected plant was Knapsack 1 (Amprion) with 1,846 MWh of negative redispatch.
What was the electricity spot price on 2026-11-08?
The EPEX Day-Ahead spot price for DE_LU ranged from 206 to 322 €/MWh with an average of 242 €/MWh.