5,941MWh Curtailed
8,057MWh Ramped Up
€3.8MEst. Cost
624 MWPeak Positive
Day-Ahead Spot: 216-653 €/MWh (avg 347)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 2 | 7,820 |
| TransnetBW | positive | 7 | 5,488 |
| Amprion | negative | 3 | 1,418 |
| Amprion | positive | 2 | 496 |
| 50Hertz | positive | 6 | 458 |
| 50Hertz | negative | 4 | 95 |
| TransnetBW | negative | 1 | 77 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 221 | 4,312 | 03:November-23:November |
| Wilhelmshaven | TenneT DE | Konventionell | negative | 232 | 4,175 | 05:November-23:November |
| Wilhelmshaven | TenneT DE | Konventionell | negative | 152 | 3,645 | 23:November-23:November |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 165 | 868 | 00:November-06:November |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 80 | 801 | 23:November-23:November |
| Emsland Block B | Amprion | Konventionell | positive | 107 | 429 | 23:November-03:November |
| WEISWEILER_H | Amprion | Konventionell | negative | 130 | 389 | 00:November-03:November |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 168 | 168 | 00:November-01:November |
| Knapsack 1 | Amprion | Konventionell | negative | 43 | 161 | 02:November-05:November |
| 50H Berlin Marzahn | 50Hertz | Konventionell | positive | 12 | 116 | 23:November-09:November |
| Börse | 50Hertz | Sonstiges | positive | 48 | 95 | 11:November-13:November |
| Boxberg (Standort) | 50Hertz | Konventionell | positive | 10 | 90 | 23:November-08:November |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 154 | 77 | 05:November-05:November |
| Börse | TransnetBW | Sonstiges | negative | 28 | 77 | 23:November-16:November |
| KMW_KW5 | Amprion | Konventionell | positive | 22 | 67 | 02:November-05:November |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 120 | 60 | 23:November-23:November |
| Schkopau | 50Hertz | Konventionell | positive | 5 | 55 | 23:November-23:November |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | positive | 13 | 52 | 01:November-05:November |
| 50H Berlin Reuter West | 50Hertz | Konventionell | positive | 5 | 50 | 23:November-23:November |
| Börse | TransnetBW | Sonstiges | positive | 80 | 40 | 05:November-05:November |
| 50H Neubrandenburg GuD | 50Hertz | Konventionell | negative | 20 | 40 | 11:November-13:November |
| Börse | TransnetBW | Sonstiges | positive | 15 | 29 | 23:November-17:November |
| 50H Halle-Dieselstr HKW-BlockA | 50Hertz | Konventionell | negative | 10 | 20 | 11:November-13:November |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | negative | 10 | 20 | 11:November-13:November |
| 50H Rostock Marienehe | 50Hertz | Konventionell | negative | 20 | 15 | 12:November-13:November |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €1.14M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-11-09?
On 2026-11-09, estimated redispatch costs were approximately €3.8 million. This includes €0.59M for renewable curtailment compensation and €3.04M for conventional ramp-up costs.
Which power plants were most affected on 2026-11-09?
The most affected plant was Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 (TransnetBW) with 4,312 MWh of positive redispatch.
What was the electricity spot price on 2026-11-09?
The EPEX Day-Ahead spot price for DE_LU ranged from 216 to 653 €/MWh with an average of 347 €/MWh.