← 2026-08-06

Friday, August 7, 2026

2026-08-08 →
2,937MWh Curtailed
2,934MWh Ramped Up
€0.9MEst. Cost
191 MWPeak Positive

Day-Ahead Spot: 8-211 €/MWh (avg 123)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 6 6,700
TransnetBW positive 4 1,555
Amprion positive 1 400
Amprion negative 9 270
TransnetBW negative 1 130
TenneT DE positive 1 0

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 250 2,000 08:August-16:August
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,600 08:August-16:August
Börse TenneT DE Sonstiges negative 267 1,600 09:August-15:August
illwerke vkw AG TransnetBW Sonstiges positive 315 1,260 17:August-21:August
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 1,200 08:August-16:August
BIBLIS_GT (bnBm) Amprion Konventionell positive 200 400 14:August-17:August
Börse TenneT DE Sonstiges negative 300 300 15:August-16:August
illwerke vkw AG TransnetBW Sonstiges negative 104 130 14:August-17:August
Heizkraftwerk Altbach/Deizisau GT E TransnetBW Konventionell positive 55 110 19:August-21:August
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 48 95 19:August-21:August
Kraftwerk Walheim GT D TransnetBW Konventionell positive 90 90 19:August-20:August
CHEMIEPARK_MARL_KRAFTWERKE Amprion Konventionell negative 45 68 15:August-17:August
STUMMHAFEN_10 Amprion Konventionell negative 50 50 15:August-16:August
NEURATH_G Amprion Konventionell negative 80 40 14:August-14:August
GUD_HERNE_6 Amprion Konventionell negative 80 40 16:August-17:August
NIEHL-31-GUD Amprion Konventionell negative 72 36 17:August-17:August
LAUSWARD_GUDF Amprion Konventionell negative 65 16 17:August-17:August
NEURATH_F Amprion Konventionell negative 50 12 14:August-14:August
EGM_DTS Amprion Sonstiges negative 2 4 14:August-17:August
INFRA_HOE_GTX1 Amprion Konventionell negative 9 4 16:August-16:August
Börse TenneT DE Sonstiges positive 1 0 08:August-08:August
Reisach TenneT DE Sonstiges negative 1 0 08:August-08:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.27M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-07?

On 2026-08-07, estimated redispatch costs were approximately €0.9 million. This includes €0.29M for renewable curtailment compensation and €0.45M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-07?

The most affected plant was BAG NWAK-Cluster 16 Regensburg-Sittling (TenneT DE) with 2,000 MWh of negative redispatch.

What was the electricity spot price on 2026-08-07?

The EPEX Day-Ahead spot price for DE_LU ranged from 8 to 211 €/MWh with an average of 123 €/MWh.