2,214MWh Curtailed
2,339MWh Ramped Up
€0.7MEst. Cost
188 MWPeak Positive
Day-Ahead Spot: -18-192 €/MWh (avg 98)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 3 | 5,700 |
| Amprion | negative | 1 | 114 |
| 50Hertz | positive | 1 | 8 |
| 50Hertz | negative | 1 | 6 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 250 | 2,375 | 07:August-17:August | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,900 | 07:August-17:August | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 1,425 | 07:August-17:August | |
| Datteln_4 | Amprion | Konventionell | negative | 114 | 114 | 16:August-17:August |
| Börse | 50Hertz | Sonstiges | positive | 34 | 8 | 14:August-15:August |
| Börse | 50Hertz | Sonstiges | negative | 23 | 6 | 05:August-05:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-08?
On 2026-08-08, estimated redispatch costs were approximately €0.7 million. This includes €0.22M for renewable curtailment compensation and €0.3M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-08?
The most affected plant was BAG NWAK-Cluster 16 Regensburg-Sittling (TenneT DE) with 2,375 MWh of negative redispatch.
What was the electricity spot price on 2026-08-08?
The EPEX Day-Ahead spot price for DE_LU ranged from -18 to 192 €/MWh with an average of 98 €/MWh.