← 2026-08-08

Sunday, August 9, 2026

2026-08-10 →
2,142MWh Curtailed
2,269MWh Ramped Up
€0.73MEst. Cost
184 MWPeak Positive

Day-Ahead Spot: -5-188 €/MWh (avg 94)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 4 4,627
50Hertz negative 2 600
50Hertz positive 1 12

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 200 1,800 07:August-16:August
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,800 07:August-16:August
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 100 900 07:August-16:August
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 295 590 15:August-17:August
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 46 127 08:August-11:August
Börse 50Hertz Sonstiges positive 47 12 15:August-15:August
50H PV Witznitz 50Hertz Erneuerbar negative 38 10 15:August-15:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-09?

On 2026-08-09, estimated redispatch costs were approximately €0.73 million. This includes €0.21M for renewable curtailment compensation and €0.28M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-09?

The most affected plant was BAG NWAK-Cluster 16 Regensburg-Sittling (TenneT DE) with 1,800 MWh of negative redispatch.

What was the electricity spot price on 2026-08-09?

The EPEX Day-Ahead spot price for DE_LU ranged from -5 to 188 €/MWh with an average of 94 €/MWh.