2,142MWh Curtailed
2,269MWh Ramped Up
€0.73MEst. Cost
184 MWPeak Positive
Day-Ahead Spot: -5-188 €/MWh (avg 94)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 4 | 4,627 |
| 50Hertz | negative | 2 | 600 |
| 50Hertz | positive | 1 | 12 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 200 | 1,800 | 07:August-16:August | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,800 | 07:August-16:August | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 100 | 900 | 07:August-16:August | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 295 | 590 | 15:August-17:August |
| AVA Cluster Helmstedt | TenneT DE | negative | 46 | 127 | 08:August-11:August | |
| Börse | 50Hertz | Sonstiges | positive | 47 | 12 | 15:August-15:August |
| 50H PV Witznitz | 50Hertz | negative | 38 | 10 | 15:August-15:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-09?
On 2026-08-09, estimated redispatch costs were approximately €0.73 million. This includes €0.21M for renewable curtailment compensation and €0.28M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-09?
The most affected plant was BAG NWAK-Cluster 16 Regensburg-Sittling (TenneT DE) with 1,800 MWh of negative redispatch.
What was the electricity spot price on 2026-08-09?
The EPEX Day-Ahead spot price for DE_LU ranged from -5 to 188 €/MWh with an average of 94 €/MWh.