← 2026-04-22

Thursday, April 23, 2026

2026-04-24 →
2,013MWh Curtailed
1,466MWh Ramped Up
€0.34MEst. Cost
160 MWPeak Positive

Day-Ahead Spot: -52-159 €/MWh (avg 63)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 26 50,617
Amprion positive 34 49,210
50Hertz negative 104 47,836
TenneT DE positive 24 46,599
TransnetBW positive 8 4,694
50Hertz positive 4 306
Amprion negative 2 300
TransnetBW negative 1 240

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 947 14,208 22:April-22:April
Börse TenneT DE Sonstiges positive 947 14,208 22:April-22:April
UW Büttel TenneT DE Erneuerbar negative 730 8,028 04:April-22:April
UW Büttel TenneT DE Erneuerbar negative 730 8,028 04:April-22:April
STUMMHAFEN_10 Amprion Konventionell positive 374 5,419 06:April-20:April
STUMMHAFEN_10 Amprion Konventionell positive 374 5,419 06:April-20:April
Knapsack 1 Amprion Konventionell positive 406 5,072 22:April-22:April
Knapsack 1 Amprion Konventionell positive 406 5,072 22:April-22:April
UW Büttel TenneT DE Erneuerbar negative 769 4,614 22:April-04:April
UW Büttel TenneT DE Erneuerbar negative 769 4,614 22:April-04:April
Irsching 4 TenneT DE Konventionell positive 314 4,472 22:April-22:April
Irsching 4 TenneT DE Konventionell positive 314 4,472 22:April-22:April
Irsching 4 TenneT DE Konventionell positive 464 3,250 15:April-22:April
Irsching 4 TenneT DE Konventionell positive 464 3,250 15:April-22:April
Emsland Block C Amprion Konventionell positive 245 2,751 02:April-21:April
Emsland Block C Amprion Konventionell positive 245 2,751 02:April-21:April
50H PV Witznitz 50Hertz Erneuerbar negative 259 2,521 07:April-16:April
50H PV Witznitz 50Hertz Erneuerbar negative 259 2,521 07:April-16:April
HERDECKE_H6 Amprion Konventionell positive 176 2,338 22:April-22:April
HERDECKE_H6 Amprion Konventionell positive 176 2,338 22:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 380 2,281 22:April-17:April
Boxberg (Standort) 50Hertz Konventionell negative 380 2,281 22:April-17:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,100 07:April-14:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,100 07:April-14:April
NIEHL-II Amprion Konventionell positive 336 2,015 22:April-04:April
NIEHL-II Amprion Konventionell positive 336 2,015 22:April-04:April
Börse TenneT DE Sonstiges negative 251 2,007 07:April-15:April
Börse TenneT DE Sonstiges negative 251 2,007 07:April-15:April
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 345 1,900 16:April-21:April
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 345 1,900 16:April-21:April
Emsland Block B Amprion Konventionell positive 231 1,562 15:April-22:April
Emsland Block B Amprion Konventionell positive 231 1,562 15:April-22:April
NIEHL-II Amprion Konventionell positive 194 1,554 14:April-22:April
NIEHL-II Amprion Konventionell positive 194 1,554 14:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 242 1,450 16:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 242 1,450 16:April-22:April
UW Dörpen-West TenneT DE Erneuerbar negative 304 1,446 23:April-04:April
UW Dörpen-West TenneT DE Erneuerbar negative 304 1,446 23:April-04:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,400 07:April-14:April
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,400 07:April-14:April
Rostock Kohlekraftwerk 50Hertz Konventionell negative 182 1,364 22:April-07:April
Rostock Kohlekraftwerk 50Hertz Konventionell negative 182 1,364 22:April-07:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 371 1,300 06:April-09:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 371 1,300 06:April-09:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 254 1,271 22:April-03:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 254 1,271 22:April-03:April
Emsland Block B Amprion Konventionell positive 180 1,262 00:April-07:April
Emsland Block B Amprion Konventionell positive 180 1,262 00:April-07:April
Jänschwalde (Standort) 50Hertz Konventionell negative 238 1,190 22:April-11:April
Jänschwalde (Standort) 50Hertz Konventionell negative 238 1,190 22:April-11:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.1M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-23?

On 2026-04-23, estimated redispatch costs were approximately €0.34 million. This includes €0.2M for renewable curtailment compensation and €0.14M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-23?

The most affected plant was Börse (TenneT DE) with 14,208 MWh of positive redispatch.

What was the electricity spot price on 2026-04-23?

The EPEX Day-Ahead spot price for DE_LU ranged from -52 to 159 €/MWh with an average of 63 €/MWh.