← 2026-04-21

Wednesday, April 22, 2026

2026-04-23 →
2,074MWh Curtailed
1,673MWh Ramped Up
€0.38MEst. Cost
172 MWPeak Positive

Day-Ahead Spot: -28-158 €/MWh (avg 76)

TSO Breakdown

TSODirectionMeasuresTotal MWh
50Hertz negative 118 31,670
Amprion positive 22 23,572
TransnetBW positive 14 21,136
TransnetBW negative 6 13,204
TenneT DE negative 10 9,003
TenneT DE positive 14 5,700
Amprion negative 6 1,152
50Hertz positive 8 1,016

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TransnetBW Sonstiges negative 389 6,418 02:April-19:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 389 6,418 02:April-19:April
Börse TransnetBW Sonstiges negative 389 6,418 02:April-19:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 389 6,418 02:April-19:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 500 3,000 16:April-22:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 500 3,000 16:April-22:April
KMW_KW3 Amprion Konventionell positive 222 2,946 22:April-11:April
KMW_KW3 Amprion Konventionell positive 222 2,946 22:April-11:April
Emsland Block C Amprion Konventionell positive 269 2,820 03:April-22:April
Emsland Block C Amprion Konventionell positive 269 2,820 03:April-22:April
Börse TenneT DE Sonstiges negative 376 2,255 09:April-15:April
Börse TenneT DE Sonstiges negative 376 2,255 09:April-15:April
Börse TenneT DE Sonstiges positive 400 2,000 16:April-21:April
Börse TenneT DE Sonstiges positive 400 2,000 16:April-21:April
50H Berlin Marzahn 50Hertz Konventionell negative 119 1,672 22:April-22:April
50H Berlin Marzahn 50Hertz Konventionell negative 119 1,672 22:April-22:April
KMW_KW3 Amprion Konventionell positive 191 1,288 15:April-22:April
KMW_KW3 Amprion Konventionell positive 191 1,288 15:April-22:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 1,275 08:April-13:April
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 1,275 08:April-13:April
Emsland Block B Amprion Konventionell positive 183 1,236 01:April-08:April
Emsland Block B Amprion Konventionell positive 183 1,236 01:April-08:April
Rostock Kohlekraftwerk 50Hertz Konventionell negative 150 1,086 05:April-22:April
Rostock Kohlekraftwerk 50Hertz Konventionell negative 150 1,086 05:April-22:April
STUMMHAFEN_10 Amprion Konventionell positive 227 963 06:April-11:April
STUMMHAFEN_10 Amprion Konventionell positive 227 963 06:April-11:April
GERSTEINW_DTG2 (KapRes) Amprion Konventionell positive 165 950 07:April-13:April
GERSTEINW_DTG2 (KapRes) Amprion Konventionell positive 165 950 07:April-13:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 141 919 06:April-12:April
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 141 919 06:April-12:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 72 859 01:April-22:April
50H Berlin Lichterfelde 50Hertz Konventionell negative 72 859 01:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 81 731 04:April-22:April
Boxberg (Standort) 50Hertz Konventionell negative 81 731 04:April-22:April
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 104 728 07:April-14:April
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 104 728 07:April-14:April
50H PV Witznitz 50Hertz Erneuerbar negative 179 717 08:April-12:April
50H PV Witznitz 50Hertz Erneuerbar negative 179 717 08:April-12:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 232 698 15:April-18:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 232 698 15:April-18:April
Lippendorf 50Hertz Konventionell negative 344 688 05:April-07:April
Lippendorf 50Hertz Konventionell negative 344 688 05:April-07:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 203 660 06:April-09:April
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 203 660 06:April-09:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 280 630 22:April-00:April
Reservekraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 280 630 22:April-00:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 192 625 06:April-10:April
50H_AVA_CR_STW 50Hertz Erneuerbar negative 192 625 06:April-10:April
50H PV Witznitz 50Hertz Erneuerbar negative 253 568 07:April-09:April
50H PV Witznitz 50Hertz Erneuerbar negative 253 568 07:April-09:April

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.11M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-04-22?

On 2026-04-22, estimated redispatch costs were approximately €0.38 million. This includes €0.21M for renewable curtailment compensation and €0.18M for conventional ramp-up costs.

Which power plants were most affected on 2026-04-22?

The most affected plant was Börse (TransnetBW) with 6,418 MWh of negative redispatch.

What was the electricity spot price on 2026-04-22?

The EPEX Day-Ahead spot price for DE_LU ranged from -28 to 158 €/MWh with an average of 76 €/MWh.