← 2026-01-12

Tuesday, January 13, 2026

2026-01-14 →
2,429MWh Curtailed
2,427MWh Ramped Up
€0.65MEst. Cost
141 MWPeak Positive

Day-Ahead Spot: 74-154 €/MWh (avg 106)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TransnetBW positive 24 15,403
TenneT DE positive 9 14,741
TenneT DE negative 15 12,320
50Hertz negative 13 6,053
Amprion negative 12 5,337
Amprion positive 2 1,642
50Hertz positive 7 567
TransnetBW negative 4 233

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 435 6,530 00:January-23:January
Börse TenneT DE Sonstiges positive 850 5,100 23:January-05:January
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 426 3,086 23:January-06:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 234 2,919 03:January-16:January
Heizkraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 370 2,774 23:January-06:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 221 2,206 23:January-09:January
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 350 2,100 23:January-05:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 272 1,973 13:January-21:January
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 220 1,759 23:January-08:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 160 1,436 23:January-08:January
Gebersdorf 2 TenneT DE Konventionell positive 181 1,405 14:January-22:January
Datteln_4 Amprion Konventionell negative 224 1,344 23:January-05:January
UW Büttel TenneT DE Erneuerbar negative 128 1,308 05:January-23:January
Emsland Block C Amprion Konventionell positive 168 1,222 14:January-23:January
Goldisthal (Standort) 50Hertz Sonstiges negative 550 1,100 09:January-11:January
Heizkraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 270 1,080 19:January-23:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 100 1,051 11:January-23:January
Grosskraftwerk Mannheim Block 8 TransnetBW Konventionell positive 200 1,050 14:January-19:January
Lippendorf 50Hertz Konventionell negative 254 1,014 19:January-23:January
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 218 874 17:January-21:January
Knapsack 1 Amprion Konventionell negative 187 748 04:January-19:January
KNAPSACK_20 Amprion Konventionell negative 144 719 14:January-19:January
NIEHL-31-GUD Amprion Konventionell negative 170 679 15:January-22:January
illwerke vkw AG TransnetBW Sonstiges positive 135 641 05:January-17:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 103 619 14:January-23:January
Kiel (Küstenkraftwerk gesamt) TenneT DE Konventionell negative 90 608 16:January-22:January
Gebersdorf 2 TenneT DE Konventionell positive 137 584 14:January-18:January
Goldisthal (Standort) 50Hertz Sonstiges negative 255 574 14:January-17:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 143 574 15:January-19:January
SW München KW-Pool TenneT DE Sonstiges positive 74 556 11:January-19:January
Boxberg (Standort) 50Hertz Konventionell negative 104 520 23:January-06:January
HAMMUENTROP_20 Amprion Konventionell negative 92 460 06:January-11:January
Heizkraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 94 424 05:January-22:January
Emsland Block C Amprion Konventionell positive 210 420 21:January-23:January
NEURATH_G Amprion Konventionell negative 128 385 20:January-23:January
SHN Cluster Heide West T411 T412 TenneT DE Erneuerbar negative 182 364 15:January-17:January
NIEHL-31-GUD Amprion Konventionell negative 109 326 23:January-02:January
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 130 325 20:January-23:January
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 91 272 23:January-02:January
50H Berlin Marzahn 50Hertz Konventionell negative 30 241 02:January-23:January
Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 TransnetBW Konventionell positive 94 212 08:January-11:January
Robert Frank 4 GT (KapRes) TenneT DE Konventionell positive 30 210 16:January-23:January
illwerke vkw AG TransnetBW Sonstiges negative 138 208 13:January-16:January
NIEHL-31-GUD Amprion Konventionell negative 102 204 18:January-20:January
Grosskraftwerk Mannheim Block 8 TransnetBW Konventionell positive 100 200 23:January-01:January
Jänschwalde (Standort) 50Hertz Konventionell negative 200 200 13:January-14:January
Kiel (Küstenkraftwerk gesamt) TenneT DE Konventionell negative 32 197 23:January-11:January
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 92 184 20:January-22:January
SW München KW-Pool TenneT DE Sonstiges positive 84 168 09:January-11:January
NIEDERAUSSEM_G Amprion Konventionell negative 52 157 16:January-19:January

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-01-13?

On 2026-01-13, estimated redispatch costs were approximately €0.65 million. This includes €0.24M for renewable curtailment compensation and €0.33M for conventional ramp-up costs.

Which power plants were most affected on 2026-01-13?

The most affected plant was Börse (TenneT DE) with 6,530 MWh of positive redispatch.

What was the electricity spot price on 2026-01-13?

The EPEX Day-Ahead spot price for DE_LU ranged from 74 to 154 €/MWh with an average of 106 €/MWh.