3,795MWh Curtailed
3,888MWh Ramped Up
€1.28MEst. Cost
209 MWPeak Positive
Day-Ahead Spot: 129-209 €/MWh (avg 164)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 5 | 12,689 |
| Amprion | positive | 9 | 6,863 |
| TenneT DE | positive | 2 | 4,745 |
| TransnetBW | positive | 2 | 692 |
| Amprion | negative | 2 | 562 |
| 50Hertz | negative | 2 | 174 |
| TransnetBW | negative | 1 | 12 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 557 | 5,568 | 22:August-08:August |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 365 | 3,190 | 22:August-22:August |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 345 | 2,500 | 14:August-22:August |
| Börse | TenneT DE | Sonstiges | negative | 259 | 2,270 | 22:August-22:August |
| Emsland Block C | Amprion | Konventionell | positive | 191 | 1,958 | 11:August-22:August |
| Emsland Block B | Amprion | Konventionell | positive | 210 | 1,890 | 22:August-07:August |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 223 | 1,841 | 13:August-22:August |
| Emsland Block C | Amprion | Konventionell | positive | 210 | 1,680 | 22:August-06:August |
| ReserveKW Staudinger 4 | TenneT DE | Konventionell | positive | 259 | 1,555 | 16:August-22:August |
| Emsland Block C | Amprion | Konventionell | positive | 214 | 1,070 | 17:August-22:August |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 103 | 672 | 15:August-21:August |
| WEISWEILER_G | Amprion | Konventionell | negative | 102 | 512 | 17:August-22:August |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 136 | 511 | 11:August-15:August |
| WEISWEILER_G | Amprion | Konventionell | positive | 58 | 115 | 13:August-15:August |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 43 | 108 | 16:August-19:August |
| Emsland Block B | Amprion | Konventionell | positive | 151 | 76 | 21:August-22:August |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 131 | 66 | 21:August-22:August |
| WEISWEILER_H | Amprion | Konventionell | positive | 59 | 59 | 14:August-15:August |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 50 | 50 | 13:August-14:August |
| Börse | TransnetBW | Sonstiges | positive | 42 | 21 | 13:August-14:August |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 6 | 13 | 16:August-18:August |
| Börse | TransnetBW | Sonstiges | negative | 12 | 12 | 11:August-15:August |
| HAMMUENTROP_20 | Amprion | Konventionell | positive | 2 | 2 | 15:August-16:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.38M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-18?
On 2026-08-18, estimated redispatch costs were approximately €1.28 million. This includes €0.38M for renewable curtailment compensation and €0.75M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-18?
The most affected plant was Wilhelmshaven (ENGIE) (TenneT DE) with 5,568 MWh of negative redispatch.
What was the electricity spot price on 2026-08-18?
The EPEX Day-Ahead spot price for DE_LU ranged from 129 to 209 €/MWh with an average of 164 €/MWh.