← 2026-06-03

Thursday, June 4, 2026

2026-06-05 →
1,516MWh Curtailed
1,265MWh Ramped Up
€0.4MEst. Cost
108 MWPeak Positive

Day-Ahead Spot: 0-122 €/MWh (avg 61)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 5 15,164
Amprion positive 11 9,427
TenneT DE negative 11 9,303
50Hertz negative 13 1,558
TransnetBW positive 8 1,256
50Hertz positive 5 741
TransnetBW negative 1 68

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 675 10,977 22:June-16:June
Irsching 4 TenneT DE Konventionell positive 385 2,984 22:June-06:June
LAUSWARD_GUDF Amprion Konventionell positive 406 2,839 22:June-05:June
UW Dörpen-West TenneT DE Erneuerbar negative 473 2,836 04:June-10:June
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 300 2,250 07:June-15:June
Emsland Block C Amprion Konventionell positive 193 2,222 00:June-22:June
NIEHL-31-GUD Amprion Konventionell positive 262 2,161 22:June-06:June
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 1,500 07:June-15:June
UW Dörpen-West TenneT DE Erneuerbar negative 306 1,226 22:June-02:June
Knapsack 1 Amprion Konventionell positive 250 1,000 22:June-02:June
Hannover-Linden GuD TenneT DE Konventionell positive 101 885 22:June-06:June
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 750 07:June-15:June
Boxberg (Standort) 50Hertz Konventionell negative 133 663 17:June-22:June
Datteln_4 Amprion Konventionell positive 234 468 02:June-04:June
Heizkraftwerk Stuttgart-Münster GT 88 TransnetBW Konventionell positive 53 356 22:June-05:June
Heizkraftwerk Stuttgart-Münster GT 87 TransnetBW Konventionell positive 54 322 22:June-04:June
Jänschwalde (Standort) 50Hertz Konventionell positive 152 303 22:June-00:June
50H Berlin Marzahn 50Hertz Konventionell negative 58 288 17:June-22:June
Kiel (Küstenkraftwerk gesamt) TenneT DE Konventionell negative 74 278 17:June-21:June
Braunschweig GT TenneT DE Konventionell positive 42 274 23:June-05:June
UW Diele TenneT DE Erneuerbar negative 117 262 22:June-01:June
Jänschwalde (Standort) 50Hertz Konventionell negative 84 251 18:June-21:June
Boxberg (Standort) 50Hertz Konventionell positive 60 242 22:June-07:June
Emsland Block B Amprion Konventionell positive 210 210 22:June-23:June
Emsland Block C Amprion Konventionell positive 210 210 22:June-23:June
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 28 169 23:June-05:June
50H Berlin Marzahn 50Hertz Konventionell positive 49 146 01:June-04:June
Emsland Block B Amprion Konventionell positive 116 116 04:June-05:June
Börse TransnetBW Sonstiges positive 75 113 23:June-07:June
Emsland Block C Amprion Konventionell positive 112 112 04:June-05:June
illwerke vkw AG TransnetBW Sonstiges positive 220 110 05:June-05:June
Heizkraftwerk_Pforzheim TransnetBW Konventionell positive 26 104 00:June-04:June
UW Büttel TenneT DE Erneuerbar negative 117 88 22:June-01:June
Netzreservekraftwerk GTKW-DA-POOL Amprion Konventionell positive 81 81 03:June-04:June
illwerke vkw AG TransnetBW Sonstiges positive 61 76 02:June-04:June
50H BASF Schwarzheide 50Hertz Konventionell negative 9 72 04:June-21:June
50H Stralsund BHKW+PtH 50Hertz Konventionell negative 10 70 15:June-22:June
Börse TransnetBW Sonstiges negative 23 68 04:June-21:June
50H Berlin Marzahn 50Hertz Konventionell negative 56 56 22:June-23:June
UW Dörpen-West TenneT DE Erneuerbar negative 100 50 00:June-00:June
50H Halle-Dieselstr HKW-BlockC 50Hertz Konventionell negative 16 48 18:June-21:June
Börse TenneT DE Sonstiges positive 90 45 23:June-00:June
Schwarze Pumpe (Standort) 50Hertz Konventionell positive 40 40 04:June-05:June
50H Hamburg MMB BHKW PtH 50Hertz Konventionell negative 9 36 22:June-02:June
UW Büttel TenneT DE Erneuerbar negative 136 34 05:June-05:June
UW Diele TenneT DE Erneuerbar negative 120 30 05:June-05:June
50H Leipzig Süd GuD 50Hertz Konventionell negative 14 29 18:June-20:June
Jänschwalde (Standort) 50Hertz Konventionell negative 44 22 21:June-21:June
50H Bad Salzungen HKW 50Hertz Konventionell negative 3 12 17:June-21:June
50H BASF Schwarzheide 50Hertz Konventionell positive 10 10 02:June-03:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.12M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-04?

On 2026-06-04, estimated redispatch costs were approximately €0.4 million. This includes €0.15M for renewable curtailment compensation and €0.12M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-04?

The most affected plant was Börse (TenneT DE) with 10,977 MWh of positive redispatch.

What was the electricity spot price on 2026-06-04?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 122 €/MWh with an average of 61 €/MWh.