1,516MWh Curtailed
1,265MWh Ramped Up
€0.4MEst. Cost
108 MWPeak Positive
Day-Ahead Spot: 0-122 €/MWh (avg 61)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 5 | 15,164 |
| Amprion | positive | 11 | 9,427 |
| TenneT DE | negative | 11 | 9,303 |
| 50Hertz | negative | 13 | 1,558 |
| TransnetBW | positive | 8 | 1,256 |
| 50Hertz | positive | 5 | 741 |
| TransnetBW | negative | 1 | 68 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 675 | 10,977 | 22:June-16:June |
| Irsching 4 | TenneT DE | Konventionell | positive | 385 | 2,984 | 22:June-06:June |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 406 | 2,839 | 22:June-05:June |
| UW Dörpen-West | TenneT DE | negative | 473 | 2,836 | 04:June-10:June | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 300 | 2,250 | 07:June-15:June | |
| Emsland Block C | Amprion | Konventionell | positive | 193 | 2,222 | 00:June-22:June |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 262 | 2,161 | 22:June-06:June |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,500 | 07:June-15:June | |
| UW Dörpen-West | TenneT DE | negative | 306 | 1,226 | 22:June-02:June | |
| Knapsack 1 | Amprion | Konventionell | positive | 250 | 1,000 | 22:June-02:June |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 101 | 885 | 22:June-06:June |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 100 | 750 | 07:June-15:June | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 133 | 663 | 17:June-22:June |
| Datteln_4 | Amprion | Konventionell | positive | 234 | 468 | 02:June-04:June |
| Heizkraftwerk Stuttgart-Münster GT 88 | TransnetBW | Konventionell | positive | 53 | 356 | 22:June-05:June |
| Heizkraftwerk Stuttgart-Münster GT 87 | TransnetBW | Konventionell | positive | 54 | 322 | 22:June-04:June |
| Jänschwalde (Standort) | 50Hertz | Konventionell | positive | 152 | 303 | 22:June-00:June |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 58 | 288 | 17:June-22:June |
| Kiel (Küstenkraftwerk gesamt) | TenneT DE | Konventionell | negative | 74 | 278 | 17:June-21:June |
| Braunschweig GT | TenneT DE | Konventionell | positive | 42 | 274 | 23:June-05:June |
| UW Diele | TenneT DE | negative | 117 | 262 | 22:June-01:June | |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 84 | 251 | 18:June-21:June |
| Boxberg (Standort) | 50Hertz | Konventionell | positive | 60 | 242 | 22:June-07:June |
| Emsland Block B | Amprion | Konventionell | positive | 210 | 210 | 22:June-23:June |
| Emsland Block C | Amprion | Konventionell | positive | 210 | 210 | 22:June-23:June |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 28 | 169 | 23:June-05:June |
| 50H Berlin Marzahn | 50Hertz | Konventionell | positive | 49 | 146 | 01:June-04:June |
| Emsland Block B | Amprion | Konventionell | positive | 116 | 116 | 04:June-05:June |
| Börse | TransnetBW | Sonstiges | positive | 75 | 113 | 23:June-07:June |
| Emsland Block C | Amprion | Konventionell | positive | 112 | 112 | 04:June-05:June |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 220 | 110 | 05:June-05:June |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 26 | 104 | 00:June-04:June |
| UW Büttel | TenneT DE | negative | 117 | 88 | 22:June-01:June | |
| Netzreservekraftwerk GTKW-DA-POOL | Amprion | Konventionell | positive | 81 | 81 | 03:June-04:June |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 61 | 76 | 02:June-04:June |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | negative | 9 | 72 | 04:June-21:June |
| 50H Stralsund BHKW+PtH | 50Hertz | Konventionell | negative | 10 | 70 | 15:June-22:June |
| Börse | TransnetBW | Sonstiges | negative | 23 | 68 | 04:June-21:June |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 56 | 56 | 22:June-23:June |
| UW Dörpen-West | TenneT DE | negative | 100 | 50 | 00:June-00:June | |
| 50H Halle-Dieselstr HKW-BlockC | 50Hertz | Konventionell | negative | 16 | 48 | 18:June-21:June |
| Börse | TenneT DE | Sonstiges | positive | 90 | 45 | 23:June-00:June |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | positive | 40 | 40 | 04:June-05:June |
| 50H Hamburg MMB BHKW PtH | 50Hertz | Konventionell | negative | 9 | 36 | 22:June-02:June |
| UW Büttel | TenneT DE | negative | 136 | 34 | 05:June-05:June | |
| UW Diele | TenneT DE | negative | 120 | 30 | 05:June-05:June | |
| 50H Leipzig Süd GuD | 50Hertz | Konventionell | negative | 14 | 29 | 18:June-20:June |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 44 | 22 | 21:June-21:June |
| 50H Bad Salzungen HKW | 50Hertz | Konventionell | negative | 3 | 12 | 17:June-21:June |
| 50H BASF Schwarzheide | 50Hertz | Konventionell | positive | 10 | 10 | 02:June-03:June |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.12M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-06-04?
On 2026-06-04, estimated redispatch costs were approximately €0.4 million. This includes €0.15M for renewable curtailment compensation and €0.12M for conventional ramp-up costs.
Which power plants were most affected on 2026-06-04?
The most affected plant was Börse (TenneT DE) with 10,977 MWh of positive redispatch.
What was the electricity spot price on 2026-06-04?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 122 €/MWh with an average of 61 €/MWh.