2,597MWh Curtailed
2,656MWh Ramped Up
€0.73MEst. Cost
142 MWPeak Positive
Day-Ahead Spot: 97-149 €/MWh (avg 112)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | positive | 8 | 18,440 |
| TenneT DE | negative | 5 | 2,461 |
| Amprion | negative | 2 | 738 |
| TransnetBW | positive | 3 | 640 |
| TransnetBW | negative | 3 | 428 |
| 50Hertz | negative | 4 | 350 |
| TenneT DE | positive | 1 | 159 |
| 50Hertz | positive | 1 | 8 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Emsland Block D | Amprion | Konventionell | positive | 597 | 13,582 | 00:January-23:January |
| Emsland Block C | Amprion | Konventionell | positive | 298 | 1,790 | 04:January-10:January |
| Irsching 4 | TenneT DE | Konventionell | negative | 178 | 1,115 | 08:January-14:January |
| KNAPSACK_20 | Amprion | Konventionell | positive | 203 | 1,017 | 05:January-10:January |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 286 | 860 | 23:January-02:January |
| Emsland Block D | Amprion | Konventionell | positive | 198 | 791 | 01:January-08:January |
| WALSUM_10 | Amprion | Konventionell | negative | 153 | 498 | 05:January-08:January |
| Emsland Block D | Amprion | Konventionell | positive | 324 | 486 | 23:January-00:January |
| Emsland Block C | Amprion | Konventionell | positive | 210 | 420 | 10:January-12:January |
| WEISWEILER_H | Amprion | Konventionell | positive | 101 | 304 | 23:January-02:January |
| UW Büttel | TenneT DE | negative | 108 | 270 | 05:January-08:January | |
| Börse | TransnetBW | Sonstiges | positive | 46 | 263 | 06:January-22:January |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 120 | 240 | 18:January-20:January |
| Kraftwerk Walheim GT D | TransnetBW | Konventionell | positive | 120 | 240 | 18:January-20:January |
| Irsching 5 | TenneT DE | Konventionell | negative | 110 | 192 | 09:January-11:January |
| Börse | TransnetBW | Sonstiges | negative | 54 | 190 | 08:January-23:January |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | negative | 67 | 168 | 13:January-16:January |
| Hannover (GKH) 2 | TenneT DE | Konventionell | positive | 53 | 159 | 04:January-07:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 183 | 138 | 00:January-00:January |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 45 | 134 | 10:January-14:January |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 34 | 103 | 10:January-14:January |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 77 | 77 | 11:January-12:January |
| Börse | TransnetBW | Sonstiges | negative | 56 | 70 | 23:January-23:January |
| WEISWEILER_G | Amprion | Konventionell | positive | 50 | 50 | 23:January-00:January |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 36 | 36 | 05:January-06:January |
| Irsching 4 | TenneT DE | Konventionell | negative | 24 | 24 | 23:January-00:January |
| Börse | 50Hertz | Sonstiges | positive | 11 | 8 | 18:January-21:January |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-01-24?
On 2026-01-24, estimated redispatch costs were approximately €0.73 million. This includes €0.26M for renewable curtailment compensation and €0.38M for conventional ramp-up costs.
Which power plants were most affected on 2026-01-24?
The most affected plant was Emsland Block D (Amprion) with 13,582 MWh of positive redispatch.
What was the electricity spot price on 2026-01-24?
The EPEX Day-Ahead spot price for DE_LU ranged from 97 to 149 €/MWh with an average of 112 €/MWh.