2,597MWh Curtailed
2,656MWh Ramped Up
€0.73MEst. Cost
142 MWPeak Positive

Day-Ahead Spot: 97-149 €/MWh (avg 112)

TSO Breakdown

TSODirectionMeasuresTotal MWh
Amprion positive 8 18,440
TenneT DE negative 5 2,461
Amprion negative 2 738
TransnetBW positive 3 640
TransnetBW negative 3 428
50Hertz negative 4 350
TenneT DE positive 1 159
50Hertz positive 1 8

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Emsland Block D Amprion Konventionell positive 597 13,582 00:January-23:January
Emsland Block C Amprion Konventionell positive 298 1,790 04:January-10:January
Irsching 4 TenneT DE Konventionell negative 178 1,115 08:January-14:January
KNAPSACK_20 Amprion Konventionell positive 203 1,017 05:January-10:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 286 860 23:January-02:January
Emsland Block D Amprion Konventionell positive 198 791 01:January-08:January
WALSUM_10 Amprion Konventionell negative 153 498 05:January-08:January
Emsland Block D Amprion Konventionell positive 324 486 23:January-00:January
Emsland Block C Amprion Konventionell positive 210 420 10:January-12:January
WEISWEILER_H Amprion Konventionell positive 101 304 23:January-02:January
UW Büttel TenneT DE Erneuerbar negative 108 270 05:January-08:January
Börse TransnetBW Sonstiges positive 46 263 06:January-22:January
NIEHL-31-GUD Amprion Konventionell negative 120 240 18:January-20:January
Kraftwerk Walheim GT D TransnetBW Konventionell positive 120 240 18:January-20:January
Irsching 5 TenneT DE Konventionell negative 110 192 09:January-11:January
Börse TransnetBW Sonstiges negative 54 190 08:January-23:January
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell negative 67 168 13:January-16:January
Hannover (GKH) 2 TenneT DE Konventionell positive 53 159 04:January-07:January
illwerke vkw AG TransnetBW Sonstiges positive 183 138 00:January-00:January
50H Berlin Lichterfelde 50Hertz Konventionell negative 45 134 10:January-14:January
50H Berlin Marzahn 50Hertz Konventionell negative 34 103 10:January-14:January
Rostock Kohlekraftwerk 50Hertz Konventionell negative 77 77 11:January-12:January
Börse TransnetBW Sonstiges negative 56 70 23:January-23:January
WEISWEILER_G Amprion Konventionell positive 50 50 23:January-00:January
50H Berlin Marzahn 50Hertz Konventionell negative 36 36 05:January-06:January
Irsching 4 TenneT DE Konventionell negative 24 24 23:January-00:January
Börse 50Hertz Sonstiges positive 11 8 18:January-21:January

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.22M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-01-24?

On 2026-01-24, estimated redispatch costs were approximately €0.73 million. This includes €0.26M for renewable curtailment compensation and €0.38M for conventional ramp-up costs.

Which power plants were most affected on 2026-01-24?

The most affected plant was Emsland Block D (Amprion) with 13,582 MWh of positive redispatch.

What was the electricity spot price on 2026-01-24?

The EPEX Day-Ahead spot price for DE_LU ranged from 97 to 149 €/MWh with an average of 112 €/MWh.