← 2026-01-24

Sunday, January 25, 2026

2026-01-26 →
2,601MWh Curtailed
2,636MWh Ramped Up
€0.71MEst. Cost
138 MWPeak Positive

Day-Ahead Spot: 99-139 €/MWh (avg 112)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 7 12,443
TenneT DE negative 8 10,205
TransnetBW positive 10 3,624
50Hertz negative 2 286
50Hertz positive 2 101

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 694 10,410 08:January-23:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 254 1,965 15:January-23:January
SHN Cluster Süderdonn T411 TenneT DE Erneuerbar negative 121 1,875 23:January-15:January
SHN Cluster Husum Nord TenneT DE Erneuerbar negative 121 1,875 23:January-15:January
SHN Cluster Klixbüll TenneT DE Erneuerbar negative 117 1,812 23:January-15:January
UW Büttel TenneT DE Erneuerbar negative 300 1,200 23:January-03:January
illwerke vkw AG TransnetBW Sonstiges positive 300 1,200 23:January-03:January
illwerke vkw AG TransnetBW Sonstiges positive 95 736 15:January-23:January
Waldeck 6 TenneT DE Sonstiges positive 240 720 20:January-23:January
UW Büttel TenneT DE Erneuerbar negative 300 600 21:January-23:January
illwerke vkw AG TransnetBW Sonstiges positive 300 600 21:January-23:January
illwerke vkw AG TransnetBW Sonstiges positive 153 575 23:January-02:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 153 575 23:January-02:January
Irsching 5 TenneT DE Konventionell positive 162 365 23:January-23:January
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 105 314 23:January-02:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 76 303 15:January-19:January
Erzhausen 2 TenneT DE Sonstiges positive 55 261 15:January-20:January
Linden GKL GT 1 TenneT DE Konventionell positive 63 253 15:January-19:January
Erzhausen 1 TenneT DE Sonstiges positive 55 248 15:January-20:January
50H Berlin Mitte 50Hertz Konventionell negative 39 234 23:January-09:January
Eltmann TenneT DE Konventionell positive 31 186 23:January-23:January
Börse 50Hertz Sonstiges positive 35 71 16:January-23:January
illwerke vkw AG TransnetBW Sonstiges positive 61 61 00:January-01:January
Boxberg (Standort) 50Hertz Konventionell negative 34 52 23:January-07:January
Pumpspeicherwerk Schluchseegruppe Häusern/Waldshut/Witznau RZ TNG TransnetBW Sonstiges positive 50 50 16:January-17:January
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 66 50 22:January-23:January
Börse TransnetBW Sonstiges positive 33 33 23:January-02:January
50H Hamburg Wedel1 50Hertz Konventionell positive 15 30 23:January-02:January
Börse TransnetBW Sonstiges positive 18 4 01:January-01:January

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-01-25?

On 2026-01-25, estimated redispatch costs were approximately €0.71 million. This includes €0.26M for renewable curtailment compensation and €0.37M for conventional ramp-up costs.

Which power plants were most affected on 2026-01-25?

The most affected plant was Börse (TenneT DE) with 10,410 MWh of positive redispatch.

What was the electricity spot price on 2026-01-25?

The EPEX Day-Ahead spot price for DE_LU ranged from 99 to 139 €/MWh with an average of 112 €/MWh.