← 2026-01-09

Saturday, January 10, 2026

2026-01-11 →
2,303MWh Curtailed
2,262MWh Ramped Up
€0.62MEst. Cost
133 MWPeak Positive

Day-Ahead Spot: 66-144 €/MWh (avg 99)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 5 8,974
Amprion positive 4 7,671
Amprion negative 2 5,397
TransnetBW positive 3 1,855
50Hertz negative 9 1,237
50Hertz positive 7 601

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse Amprion Konventionell negative 399 5,282 02:January-16:January
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 399 5,282 02:January-16:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 368 3,124 08:January-16:January
UW Büttel TenneT DE Erneuerbar negative 394 2,758 05:January-12:January
Wilhelmshaven (ENGIE) TenneT DE Konventionell negative 209 1,517 05:January-14:January
Heizkraftwerk Heilbronn Block 7 TransnetBW Konventionell positive 260 1,300 00:January-05:January
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 312 1,250 03:January-07:January
Emsland Block C Amprion Konventionell positive 173 1,212 07:January-16:January
Emsland Block D Amprion Konventionell positive 223 1,117 04:January-09:January
illwerke vkw AG TransnetBW Sonstiges positive 77 405 07:January-16:January
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 100 350 14:January-17:January
UW Emden-Ost TenneT DE Erneuerbar negative 82 326 05:January-12:January
50H InfraLeuna IKW 50Hertz Konventionell positive 34 270 08:January-16:January
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 253 253 00:January-01:January
50H UW Bertikow 50Hertz Erneuerbar negative 233 233 00:January-01:January
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 43 150 07:January-12:January
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 73 128 02:January-04:January
Schkopau 50Hertz Konventionell positive 98 123 08:January-09:January
HAMMUENTROP_20 Amprion Konventionell negative 115 115 12:January-13:January
Schkopau 50Hertz Konventionell positive 111 111 09:January-10:January
50H Leipzig Nord GuD 50Hertz Konventionell negative 26 103 02:January-06:January
50H Berlin Marzahn 50Hertz Konventionell negative 36 72 12:January-14:January
NIEHL-31-GUD Amprion Konventionell positive 60 60 07:January-08:January
Schwarze Pumpe (Standort) 50Hertz Konventionell positive 48 48 09:January-10:January
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 48 36 12:January-14:January
50H Berlin Mitte 50Hertz Konventionell negative 16 32 12:January-14:January
50H Berlin Mitte 50Hertz Konventionell positive 6 31 08:January-15:January
Jänschwalde (Standort) 50Hertz Konventionell negative 24 30 12:January-14:January
Börse 50Hertz Sonstiges positive 8 10 11:January-19:January
50H Berlin Lichterfelde 50Hertz Konventionell positive 1 8 08:January-16:January

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-01-10?

On 2026-01-10, estimated redispatch costs were approximately €0.62 million. This includes €0.23M for renewable curtailment compensation and €0.29M for conventional ramp-up costs.

Which power plants were most affected on 2026-01-10?

The most affected plant was Börse (Amprion) with 5,282 MWh of negative redispatch.

What was the electricity spot price on 2026-01-10?

The EPEX Day-Ahead spot price for DE_LU ranged from 66 to 144 €/MWh with an average of 99 €/MWh.