2,303MWh Curtailed
2,262MWh Ramped Up
€0.62MEst. Cost
133 MWPeak Positive
Day-Ahead Spot: 66-144 €/MWh (avg 99)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 5 | 8,974 |
| Amprion | positive | 4 | 7,671 |
| Amprion | negative | 2 | 5,397 |
| TransnetBW | positive | 3 | 1,855 |
| 50Hertz | negative | 9 | 1,237 |
| 50Hertz | positive | 7 | 601 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | Amprion | Konventionell | negative | 399 | 5,282 | 02:January-16:January |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 399 | 5,282 | 02:January-16:January |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 368 | 3,124 | 08:January-16:January |
| UW Büttel | TenneT DE | negative | 394 | 2,758 | 05:January-12:January | |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 209 | 1,517 | 05:January-14:January |
| Heizkraftwerk Heilbronn Block 7 | TransnetBW | Konventionell | positive | 260 | 1,300 | 00:January-05:January |
| AVA Cluster Helmstedt | TenneT DE | negative | 312 | 1,250 | 03:January-07:January | |
| Emsland Block C | Amprion | Konventionell | positive | 173 | 1,212 | 07:January-16:January |
| Emsland Block D | Amprion | Konventionell | positive | 223 | 1,117 | 04:January-09:January |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 77 | 405 | 07:January-16:January |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 100 | 350 | 14:January-17:January | |
| UW Emden-Ost | TenneT DE | negative | 82 | 326 | 05:January-12:January | |
| 50H InfraLeuna IKW | 50Hertz | Konventionell | positive | 34 | 270 | 08:January-16:January |
| 50H OWP Baltic Eagle | 50Hertz | negative | 253 | 253 | 00:January-01:January | |
| 50H UW Bertikow | 50Hertz | negative | 233 | 233 | 00:January-01:January | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 43 | 150 | 07:January-12:January |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 73 | 128 | 02:January-04:January | |
| Schkopau | 50Hertz | Konventionell | positive | 98 | 123 | 08:January-09:January |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 115 | 115 | 12:January-13:January |
| Schkopau | 50Hertz | Konventionell | positive | 111 | 111 | 09:January-10:January |
| 50H Leipzig Nord GuD | 50Hertz | Konventionell | negative | 26 | 103 | 02:January-06:January |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 36 | 72 | 12:January-14:January |
| NIEHL-31-GUD | Amprion | Konventionell | positive | 60 | 60 | 07:January-08:January |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | positive | 48 | 48 | 09:January-10:January |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 48 | 36 | 12:January-14:January |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 16 | 32 | 12:January-14:January |
| 50H Berlin Mitte | 50Hertz | Konventionell | positive | 6 | 31 | 08:January-15:January |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 24 | 30 | 12:January-14:January |
| Börse | 50Hertz | Sonstiges | positive | 8 | 10 | 11:January-19:January |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | positive | 1 | 8 | 08:January-16:January |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.19M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-01-10?
On 2026-01-10, estimated redispatch costs were approximately €0.62 million. This includes €0.23M for renewable curtailment compensation and €0.29M for conventional ramp-up costs.
Which power plants were most affected on 2026-01-10?
The most affected plant was Börse (Amprion) with 5,282 MWh of negative redispatch.
What was the electricity spot price on 2026-01-10?
The EPEX Day-Ahead spot price for DE_LU ranged from 66 to 144 €/MWh with an average of 99 €/MWh.