1,937MWh Curtailed
1,241MWh Ramped Up
€0.4MEst. Cost
148 MWPeak Positive
Day-Ahead Spot: -75-144 €/MWh (avg 62)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 6 | 14,608 |
| TenneT DE | positive | 2 | 10,159 |
| TransnetBW | positive | 3 | 1,278 |
| 50Hertz | negative | 12 | 1,121 |
| TransnetBW | negative | 1 | 480 |
| Amprion | positive | 3 | 195 |
| Amprion | negative | 1 | 8 |
| 50Hertz | positive | 1 | 2 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 294 | 7,060 | 22:April-22:April |
| Börse | TenneT DE | Sonstiges | negative | 294 | 7,060 | 22:April-22:April |
| Börse | TenneT DE | Sonstiges | positive | 376 | 3,099 | 22:April-18:April |
| Börse | TenneT DE | Sonstiges | negative | 400 | 3,000 | 07:April-15:April |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | negative | 217 | 2,060 | 07:April-16:April |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,400 | 08:April-15:April | |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 4 | TransnetBW | Konventionell | positive | 200 | 1,050 | 16:April-22:April |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 150 | 1,050 | 08:April-15:April | |
| 50H_EDIS_CR_WU | 50Hertz | negative | 222 | 500 | 08:April-10:April | |
| UW Höpfingen | TransnetBW | negative | 80 | 480 | 08:April-14:April | |
| 50H PV Witznitz | 50Hertz | negative | 126 | 189 | 07:April-09:April | |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 173 | 173 | 06:April-07:April |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 105 | 158 | 17:April-18:April |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 20 | 100 | 07:April-14:April |
| 50H PV Bartow | 50Hertz | negative | 99 | 99 | 07:April-08:April | |
| Börse | TransnetBW | Sonstiges | positive | 93 | 70 | 16:April-16:April |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 136 | 68 | 07:April-07:April |
| Datteln_4 | Amprion | Konventionell | positive | 60 | 60 | 07:April-08:April |
| AVA Cluster SC Dipperz Großkrotzenburg | TenneT DE | negative | 50 | 38 | 15:April-16:April | |
| KMW_KW5 | Amprion | Konventionell | positive | 35 | 35 | 07:April-08:April |
| 50H UW Schönewalde | 50Hertz | negative | 24 | 24 | 07:April-08:April | |
| 50H Berlin Mitte | 50Hertz | Konventionell | negative | 20 | 20 | 06:April-07:April |
| 50H Halle-Dieselstr HKW-BlockB | 50Hertz | Konventionell | negative | 9 | 18 | 06:April-08:April |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 10 | 10 | 07:April-08:April |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 10 | 10 | 06:April-07:April |
| Börse | Amprion | Konventionell | negative | 30 | 8 | 16:April-17:April |
| 50H UW Bertikow | 50Hertz | negative | 16 | 8 | 07:April-07:April | |
| 50H Parchim | 50Hertz | Konventionell | negative | 2 | 2 | 08:April-09:April |
| Börse | 50Hertz | Sonstiges | positive | 2 | 2 | 08:April-09:April |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.12M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-04-29?
On 2026-04-29, estimated redispatch costs were approximately €0.4 million. This includes €0.19M for renewable curtailment compensation and €0.11M for conventional ramp-up costs.
Which power plants were most affected on 2026-04-29?
The most affected plant was ReserveKW Zolling 5 (TenneT DE) with 7,060 MWh of positive redispatch.
What was the electricity spot price on 2026-04-29?
The EPEX Day-Ahead spot price for DE_LU ranged from -75 to 144 €/MWh with an average of 62 €/MWh.