1,848MWh Curtailed
1,403MWh Ramped Up
€0.45MEst. Cost
176 MWPeak Positive
Day-Ahead Spot: -71-155 €/MWh (avg 68)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 9 | 8,860 |
| Amprion | positive | 2 | 5,746 |
| Amprion | negative | 1 | 5,688 |
| TenneT DE | positive | 1 | 3,272 |
| 50Hertz | negative | 8 | 1,377 |
| 50Hertz | positive | 1 | 40 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | Amprion | Konventionell | negative | 495 | 5,688 | 04:April-15:April |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 495 | 5,688 | 04:April-15:April |
| Börse | TenneT DE | Sonstiges | negative | 327 | 3,272 | 22:April-08:May |
| ReserveKW Zolling 5 | TenneT DE | Konventionell | positive | 327 | 3,272 | 22:April-08:May |
| Börse | TenneT DE | Sonstiges | negative | 400 | 2,800 | 08:April-15:April |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,500 | 07:April-15:April | |
| 50H PV Witznitz | 50Hertz | negative | 315 | 1,260 | 09:April-13:April | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 150 | 1,125 | 07:April-15:April | |
| Börse | TenneT DE | Sonstiges | negative | 96 | 96 | 10:April-11:April |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 12 | 58 | 07:April-14:April |
| 50H OWP Arcadis Ost 1 | 50Hertz | negative | 43 | 43 | 10:April-11:April | |
| Thyrow A (SysRel) | 50Hertz | Konventionell | positive | 20 | 40 | 06:April-08:April |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 24 | 35 | 06:April-08:April |
| 50H UW Bertikow | 50Hertz | negative | 31 | 31 | 10:April-11:April | |
| UW Diele | TenneT DE | negative | 25 | 25 | 10:April-11:April | |
| UW Büttel | TenneT DE | negative | 15 | 15 | 10:April-11:April | |
| WP Emsland | TenneT DE | negative | 14 | 14 | 10:April-11:April | |
| UW Emden-Ost | TenneT DE | negative | 12 | 12 | 10:April-11:April | |
| 50H UW Bertikow | 50Hertz | negative | 10 | 5 | 08:April-08:April | |
| 50H UW Iven | 50Hertz | negative | 2 | 2 | 10:April-11:April | |
| 50H UW Altentreptow | 50Hertz | negative | 1 | 1 | 10:April-11:April | |
| 50H UW Schönewalde | 50Hertz | negative | 1 | 0 | 10:April-11:April |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.14M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-04-30?
On 2026-04-30, estimated redispatch costs were approximately €0.45 million. This includes €0.18M for renewable curtailment compensation and €0.14M for conventional ramp-up costs.
Which power plants were most affected on 2026-04-30?
The most affected plant was Börse (Amprion) with 5,688 MWh of negative redispatch.
What was the electricity spot price on 2026-04-30?
The EPEX Day-Ahead spot price for DE_LU ranged from -71 to 155 €/MWh with an average of 68 €/MWh.