1,742MWh Curtailed
-94MWh Ramped Up
€0.38MEst. Cost
236 MWPeak Positive
Day-Ahead Spot: -250-159 €/MWh (avg 38)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 4 | 10,069 |
| TenneT DE | positive | 2 | 2,479 |
| 50Hertz | negative | 1 | 17 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | negative | 383 | 3,737 | 05:May-15:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 300 | 2,250 | 07:May-15:May | |
| Börse | TenneT DE | Sonstiges | negative | 304 | 2,207 | 22:May-05:May |
| Irsching 4 | TenneT DE | Konventionell | positive | 304 | 2,207 | 22:May-05:May |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 1,875 | 07:May-15:May | |
| Börse | TenneT DE | Sonstiges | positive | 181 | 272 | 22:May-23:May |
| Börse | 50Hertz | Sonstiges | negative | 4 | 17 | 08:May-12:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.11M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-01?
On 2026-05-01, estimated redispatch costs were approximately €0.38 million. This includes €0.17M for renewable curtailment compensation and €-0.01M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-01?
The most affected plant was Börse (TenneT DE) with 3,737 MWh of negative redispatch.
What was the electricity spot price on 2026-05-01?
The EPEX Day-Ahead spot price for DE_LU ranged from -250 to 159 €/MWh with an average of 38 €/MWh.