1,916MWh Curtailed
1,658MWh Ramped Up
€0.57MEst. Cost
253 MWPeak Positive
Day-Ahead Spot: -200-165 €/MWh (avg 58)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 3 | 7,193 |
| 50Hertz | negative | 4 | 1,873 |
| Amprion | positive | 3 | 1,338 |
| TenneT DE | positive | 2 | 457 |
| 50Hertz | positive | 1 | 52 |
| TransnetBW | positive | 1 | 1 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | negative | 384 | 3,068 | 06:May-15:May |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 300 | 2,250 | 07:May-15:May | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 1,875 | 07:May-15:May | |
| 50H PV Witznitz | 50Hertz | negative | 240 | 1,738 | 06:May-13:May | |
| Emsland Block C | Amprion | Konventionell | positive | 169 | 1,183 | 06:May-13:May |
| Braunschweig HKWM GT31 | TenneT DE | Konventionell | positive | 53 | 238 | 08:May-13:May |
| Braunschweig GT | TenneT DE | Konventionell | positive | 38 | 219 | 08:May-13:May |
| Börse | Amprion | Konventionell | positive | 100 | 100 | 09:May-10:May |
| 50H UW Bertikow | 50Hertz | negative | 58 | 58 | 12:May-13:May | |
| Emsland Block B | Amprion | Konventionell | positive | 55 | 55 | 09:May-10:May |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | negative | 30 | 52 | 16:May-18:May |
| Börse | 50Hertz | Sonstiges | positive | 30 | 52 | 16:May-18:May |
| 50H_WEMA_CR_GOE | 50Hertz | negative | 50 | 25 | 08:May-08:May | |
| Börse | TransnetBW | Sonstiges | positive | 0 | 1 | 08:May-13:May |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-05-02?
On 2026-05-02, estimated redispatch costs were approximately €0.57 million. This includes €0.19M for renewable curtailment compensation and €0.15M for conventional ramp-up costs.
Which power plants were most affected on 2026-05-02?
The most affected plant was Börse (TenneT DE) with 3,068 MWh of negative redispatch.
What was the electricity spot price on 2026-05-02?
The EPEX Day-Ahead spot price for DE_LU ranged from -200 to 165 €/MWh with an average of 58 €/MWh.