AVA Cluster SC Dipperz Großkrotzenburg

ErneuerbarTenneT DE

15,139Total MWh
16Measures
79 MWAvg Power
16Curtailments
0Ramp-ups

Data: 2025-10-21 to 2026-04-29

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-04-29 1 38
2025-12-08 1 290
2025-11-29 2 407
2025-11-23 2 699
2025-10-30 2 778
2025-10-27 2 2,136
2025-10-26 2 3,306
2025-10-24 1 2,150
2025-10-23 2 4,376
2025-10-21 1 960

Recent Measures

DateTSODirAvg MWMWhTime
2026-04-29 TenneT DE negative 50 38 15:April-16:April
2025-12-08 TenneT DE negative 55 290 00:December-06:December
2025-11-29 TenneT DE negative 47 372 23:November-07:November
2025-11-29 TenneT DE negative 46 34 22:November-23:November
2025-11-23 TenneT DE negative 20 20 23:November-00:November
2025-11-23 TenneT DE negative 85 679 15:November-23:November
2025-10-30 TenneT DE negative 60 361 10:October-16:October
2025-10-30 TenneT DE negative 104 417 06:October-10:October
2025-10-27 TenneT DE negative 69 1,593 23:October-22:October
2025-10-27 TenneT DE negative 83 542 09:October-16:October
2025-10-26 TenneT DE negative 111 1,108 23:October-09:October
2025-10-26 TenneT DE negative 113 2,198 03:October-23:October
2025-10-24 TenneT DE negative 97 2,150 22:October-20:October
2025-10-23 TenneT DE negative 105 2,282 22:October-21:October
2025-10-23 TenneT DE negative 115 2,094 03:October-22:October
2025-10-21 TenneT DE negative 101 960 03:October-14:October

Frequently Asked Questions

What is the redispatch history of AVA Cluster SC Dipperz Großkrotzenburg?

AVA Cluster SC Dipperz Großkrotzenburg is a Erneuerbar power plant in the TenneT DE grid zone. It has received 16 redispatch instructions totaling 15,139 MWh since 2025-10-21.

Why is AVA Cluster SC Dipperz Großkrotzenburg frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.