2,647MWh Curtailed
3,760MWh Ramped Up
€1.13MEst. Cost
484 MWPeak Positive
Day-Ahead Spot: 77-342 €/MWh (avg 142)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 8 | 6,498 |
| Amprion | negative | 10 | 804 |
| Amprion | positive | 2 | 104 |
| 50Hertz | positive | 2 | 60 |
| TransnetBW | positive | 2 | 34 |
| TransnetBW | negative | 2 | 28 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 280 | 2,100 | 08:June-16:June | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 280 | 2,100 | 08:June-16:June | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 750 | 08:June-16:June | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 750 | 08:June-16:June | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 50 | 375 | 08:June-16:June | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 50 | 375 | 08:June-16:June | |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 124 | 155 | 15:June-16:June |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 124 | 155 | 15:June-16:June |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 121 | 121 | 15:June-16:June |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 121 | 121 | 15:June-16:June |
| WALSUM_10 | Amprion | Konventionell | negative | 82 | 102 | 14:June-16:June |
| WALSUM_10 | Amprion | Konventionell | negative | 82 | 102 | 14:June-16:June |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 14 | 52 | 08:June-15:June |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 14 | 52 | 08:June-15:June |
| Börse | 50Hertz | Sonstiges | positive | 15 | 30 | 16:June-18:June |
| Börse | 50Hertz | Sonstiges | positive | 15 | 30 | 16:June-18:June |
| Eltmann | TenneT DE | Konventionell | negative | 24 | 24 | 15:June-16:June |
| Eltmann | TenneT DE | Konventionell | negative | 24 | 24 | 15:June-16:June |
| Börse | TransnetBW | Sonstiges | positive | 34 | 17 | 14:June-16:June |
| Börse | TransnetBW | Sonstiges | positive | 34 | 17 | 14:June-16:June |
| Börse | TransnetBW | Sonstiges | negative | 57 | 14 | 15:June-15:June |
| Börse | TransnetBW | Sonstiges | negative | 57 | 14 | 15:June-15:June |
| KMW_KW3 | Amprion | Konventionell | negative | 12 | 12 | 12:June-13:June |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 12 | 12 | 13:June-15:June |
| KMW_KW3 | Amprion | Konventionell | negative | 12 | 12 | 12:June-13:June |
| GUD_HERNE_6 | Amprion | Konventionell | negative | 12 | 12 | 13:June-15:June |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.34M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-06-29?
On 2026-06-29, estimated redispatch costs were approximately €1.13 million. This includes €0.26M for renewable curtailment compensation and €0.65M for conventional ramp-up costs.
Which power plants were most affected on 2026-06-29?
The most affected plant was BAG NWAK-Cluster 15 Pleinting (TenneT DE) with 2,100 MWh of negative redispatch.
What was the electricity spot price on 2026-06-29?
The EPEX Day-Ahead spot price for DE_LU ranged from 77 to 342 €/MWh with an average of 142 €/MWh.