← 2026-06-29

Tuesday, June 30, 2026

2026-07-01 →
3,168MWh Curtailed
4,969MWh Ramped Up
€1.67MEst. Cost
599 MWPeak Positive

Day-Ahead Spot: 91-537 €/MWh (avg 188)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TransnetBW positive 1 400
50Hertz negative 1 82

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
illwerke vkw AG TransnetBW Sonstiges positive 200 400 03:June-05:June
50H_WEMA_CR_PE 50Hertz Erneuerbar negative 37 82 09:June-11:June

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.5M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-06-30?

On 2026-06-30, estimated redispatch costs were approximately €1.67 million. This includes €0.32M for renewable curtailment compensation and €1.08M for conventional ramp-up costs.

Which power plants were most affected on 2026-06-30?

The most affected plant was illwerke vkw AG (TransnetBW) with 400 MWh of positive redispatch.

What was the electricity spot price on 2026-06-30?

The EPEX Day-Ahead spot price for DE_LU ranged from 91 to 537 €/MWh with an average of 188 €/MWh.