2,187MWh Curtailed
1,830MWh Ramped Up
€0.49MEst. Cost
162 MWPeak Positive
Day-Ahead Spot: 25-165 €/MWh (avg 88)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TransnetBW | positive | 2 | 4,152 |
| Amprion | negative | 6 | 3,600 |
| TenneT DE | negative | 3 | 3,275 |
| 50Hertz | negative | 5 | 332 |
| TransnetBW | negative | 1 | 119 |
| Amprion | positive | 1 | 24 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 282 | 3,102 | 23:March-10:March |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 255 | 2,422 | 23:March-08:March |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 223 | 1,225 | 08:March-14:March | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 223 | 1,225 | 08:March-14:March | |
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 247 | 1,050 | 01:March-05:March |
| AVA Cluster Voslapp | TenneT DE | negative | 220 | 825 | 13:March-17:March | |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 97 | 340 | 02:March-05:March |
| NIEDERAUSSEM_G | Amprion | Konventionell | negative | 100 | 325 | 02:March-05:March |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 95 | 285 | 02:March-05:March |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 85 | 128 | 23:March-01:March |
| Börse | TransnetBW | Sonstiges | negative | 68 | 119 | 01:March-06:March |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 105 | 105 | 06:March-07:March |
| Börse | Amprion | Konventionell | negative | 80 | 100 | 01:March-05:March |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 50 | 100 | 08:March-10:March | |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 60 | 60 | 06:March-07:March |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 74 | 56 | 06:March-07:March |
| GERSTEINW_K1 (KapRes) | Amprion | Konventionell | positive | 32 | 24 | 09:March-09:March |
| 50H_EDIS_CR_HND | 50Hertz | negative | 15 | 11 | 11:March-12:March |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.15M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-03-28?
On 2026-03-28, estimated redispatch costs were approximately €0.49 million. This includes €0.22M for renewable curtailment compensation and €0.22M for conventional ramp-up costs.
Which power plants were most affected on 2026-03-28?
The most affected plant was Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 (TransnetBW) with 3,102 MWh of positive redispatch.
What was the electricity spot price on 2026-03-28?
The EPEX Day-Ahead spot price for DE_LU ranged from 25 to 165 €/MWh with an average of 88 €/MWh.