← 2026-03-10

Wednesday, March 11, 2026

2026-03-12 →
2,160MWh Curtailed
1,824MWh Ramped Up
€0.52MEst. Cost
169 MWPeak Positive

Day-Ahead Spot: 0-169 €/MWh (avg 80)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 11 27,119
TransnetBW positive 15 11,030
TenneT DE negative 10 10,177
50Hertz negative 30 10,107
Amprion positive 6 6,103
Amprion negative 3 1,746
TransnetBW negative 1 245

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 862 15,515 23:March-23:March
Börse TenneT DE Sonstiges positive 734 7,341 02:March-23:March
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 465 6,162 23:March-23:March
UW Büttel TenneT DE Erneuerbar negative 376 3,098 08:March-19:March
Netzreservekraftwerk BERGKAMEN_A Amprion Konventionell positive 253 2,532 23:March-09:March
AVA Cluster Voslapp TenneT DE Erneuerbar negative 229 2,174 07:March-17:March
Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 TransnetBW Konventionell positive 287 2,082 08:March-15:March
NEURATH_G Amprion Konventionell negative 185 1,570 00:March-09:March
Emsland Block C Amprion Konventionell positive 191 1,480 00:March-08:March
Linden GKL GT 1 TenneT DE Konventionell positive 62 1,388 23:March-21:March
UW Dörpen-West TenneT DE Erneuerbar negative 294 1,174 05:March-09:March
Emsland Block D Amprion Konventionell positive 303 1,062 03:March-07:March
50H_EDIS_CR_WU 50Hertz Erneuerbar negative 210 1,050 09:March-14:March
Linden GKL GT 3 TenneT DE Konventionell positive 44 978 23:March-21:March
50H OWP Arkona 50Hertz Erneuerbar negative 175 874 09:March-14:March
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 250 812 10:March-14:March
UW Dörpen-West TenneT DE Erneuerbar negative 264 792 02:March-05:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 263 789 04:March-07:March
Linden GKL DT TenneT DE Konventionell positive 35 785 23:March-21:March
UW Büttel TenneT DE Erneuerbar negative 153 764 23:March-04:March
UW Büttel TenneT DE Erneuerbar negative 50 654 08:March-21:March
Emsland Block D Amprion Konventionell positive 189 614 05:March-08:March
Schwarze Pumpe (Standort) 50Hertz Konventionell negative 139 590 00:March-06:March
50H Berlin Marzahn 50Hertz Konventionell negative 56 565 23:March-20:March
Grosskraftwerk Mannheim Block 9 TransnetBW Konventionell positive 132 529 08:March-12:March
50H Hamburg Tiefstack 2 HKW SK 50Hertz Konventionell negative 88 528 16:March-22:March
UW Diele TenneT DE Erneuerbar negative 130 522 05:March-09:March
50H PV Witznitz 50Hertz Erneuerbar negative 225 450 10:March-12:March
50H OWP Baltic Eagle 50Hertz Erneuerbar negative 144 431 09:March-12:March
50H PV Witznitz 50Hertz Erneuerbar negative 206 413 08:March-10:March
50H OWP Arcadis Ost 1 50Hertz Erneuerbar negative 73 365 09:March-14:March
50H OWP Wikinger 50Hertz Erneuerbar negative 88 350 09:March-13:March
Jänschwalde (Standort) 50Hertz Konventionell negative 171 342 05:March-07:March
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 112 338 10:March-13:March
Linden GKL GT 1 TenneT DE Konventionell positive 53 330 16:March-23:March
50H Berlin Marzahn 50Hertz Konventionell negative 62 308 17:March-23:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 86 302 08:March-12:March
Jänschwalde (Standort) 50Hertz Konventionell negative 103 283 14:March-23:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell positive 83 270 11:March-14:March
Linden GKL GT 3 TenneT DE Konventionell positive 47 269 17:March-23:March
50H Hamburg Wedel1 50Hertz Konventionell negative 45 268 06:March-22:March
Kraftwerk Walheim GT D TransnetBW Konventionell positive 102 256 09:March-12:March
Reservekraftwerk Marbach GT 3 TransnetBW Konventionell positive 64 255 05:March-12:March
Irsching 5 TenneT DE Konventionell positive 168 252 21:March-22:March
illwerke vkw AG TransnetBW Sonstiges positive 126 251 11:March-13:March
Heizkraftwerk Altbach/Deizisau Block 2 TransnetBW Konventionell negative 49 245 16:March-23:March
Emsland Block D Amprion Konventionell positive 245 245 07:March-08:March
50H UW Schönewalde 50Hertz Erneuerbar negative 46 232 09:March-15:March
Boxberg (Standort) 50Hertz Konventionell negative 58 231 15:March-23:March
50H Erfurt-Ost HKW GuD 50Hertz Konventionell negative 15 231 02:March-20:March

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.16M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-03-11?

On 2026-03-11, estimated redispatch costs were approximately €0.52 million. This includes €0.22M for renewable curtailment compensation and €0.2M for conventional ramp-up costs.

Which power plants were most affected on 2026-03-11?

The most affected plant was Börse (TenneT DE) with 15,515 MWh of positive redispatch.

What was the electricity spot price on 2026-03-11?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 169 €/MWh with an average of 80 €/MWh.