3,271MWh Curtailed
2,950MWh Ramped Up
€0.9MEst. Cost
181 MWPeak Positive
Day-Ahead Spot: 95-245 €/MWh (avg 148)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | negative | 6 | 1,607 |
| TransnetBW | positive | 6 | 1,086 |
| TenneT DE | positive | 4 | 1,029 |
| TenneT DE | negative | 2 | 458 |
| TransnetBW | negative | 2 | 163 |
| Amprion | positive | 2 | 42 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| KNAPSACK_20 | Amprion | Konventionell | negative | 147 | 1,068 | 23:February-06:February |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 117 | 675 | 23:February-04:February |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 94 | 518 | 23:February-06:February |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 165 | 455 | 14:February-17:February |
| ReserveKW Ingolstadt 4 | TenneT DE | Konventionell | positive | 97 | 435 | 14:February-19:February |
| KNAPSACK_20 | Amprion | Konventionell | negative | 152 | 228 | 21:February-23:February |
| Heizkraftwerk Altbach/Deizisau GT E | TransnetBW | Konventionell | positive | 60 | 135 | 15:February-17:February |
| Knapsack 1 | Amprion | Konventionell | negative | 105 | 131 | 21:February-23:February |
| Knapsack 1 | Amprion | Konventionell | negative | 115 | 115 | 22:February-23:February |
| Börse | TransnetBW | Sonstiges | negative | 35 | 113 | 23:February-06:February |
| Heizkraftwerk Altbach/Deizisau Block 2 | TransnetBW | Konventionell | positive | 106 | 106 | 22:February-23:February |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 60 | 105 | 15:February-17:February |
| SW München KW-Pool | TenneT DE | Sonstiges | positive | 59 | 59 | 22:February-23:February |
| Börse | TransnetBW | Sonstiges | positive | 115 | 58 | 21:February-22:February |
| Börse | TransnetBW | Sonstiges | negative | 100 | 50 | 22:February-23:February |
| Börse | Amprion | Konventionell | negative | 70 | 35 | 14:February-19:February |
| KMW_KW5 | Amprion | Konventionell | positive | 31 | 31 | 22:February-23:February |
| Knapsack 1 | Amprion | Konventionell | negative | 120 | 30 | 23:February-23:February |
| Börse | TenneT DE | Sonstiges | positive | 70 | 18 | 14:February-15:February |
| UPM Schongau HKW3 | Amprion | Konventionell | positive | 11 | 11 | 22:February-23:February |
| Börse | TransnetBW | Sonstiges | positive | 30 | 8 | 23:February-23:February |
| UW Emden-Ost | TenneT DE | negative | 10 | 2 | 17:February-17:February |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.27M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-02-09?
On 2026-02-09, estimated redispatch costs were approximately €0.9 million. This includes €0.33M for renewable curtailment compensation and €0.53M for conventional ramp-up costs.
Which power plants were most affected on 2026-02-09?
The most affected plant was KNAPSACK_20 (Amprion) with 1,068 MWh of negative redispatch.
What was the electricity spot price on 2026-02-09?
The EPEX Day-Ahead spot price for DE_LU ranged from 95 to 245 €/MWh with an average of 148 €/MWh.