2,624MWh Curtailed
2,757MWh Ramped Up
€0.79MEst. Cost
190 MWPeak Positive
Day-Ahead Spot: 0-190 €/MWh (avg 120)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| Amprion | negative | 3 | 2,592 |
| TenneT DE | negative | 3 | 2,565 |
| 50Hertz | negative | 4 | 261 |
| TransnetBW | positive | 1 | 85 |
| TransnetBW | negative | 1 | 18 |
| 50Hertz | positive | 1 | 7 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| NEURATH_F | Amprion | Konventionell | negative | 255 | 2,038 | 10:August-18:August |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 250 | 2,000 | 09:August-17:August | |
| UW Büttel | TenneT DE | negative | 138 | 415 | 12:August-15:August | |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 183 | 366 | 14:August-16:August |
| NIEDERAUSSEM_H | Amprion | Konventionell | negative | 94 | 188 | 14:August-16:August |
| 50H PV Witznitz | 50Hertz | negative | 54 | 175 | 11:August-15:August | |
| UW Emden-Ost | TenneT DE | negative | 75 | 150 | 13:August-15:August | |
| Börse | TransnetBW | Sonstiges | positive | 113 | 85 | 16:August-17:August |
| 50H UW Schönewalde | 50Hertz | negative | 14 | 46 | 11:August-15:August | |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | negative | 6 | 26 | 11:August-15:August |
| Börse | TransnetBW | Sonstiges | negative | 35 | 18 | 16:August-17:August |
| 50H UW Bertikow | 50Hertz | negative | 8 | 14 | 11:August-15:August | |
| Börse | 50Hertz | Sonstiges | positive | 29 | 7 | 00:August-01:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.24M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-01?
On 2026-08-01, estimated redispatch costs were approximately €0.79 million. This includes €0.26M for renewable curtailment compensation and €0.41M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-01?
The most affected plant was NEURATH_F (Amprion) with 2,038 MWh of negative redispatch.
What was the electricity spot price on 2026-08-01?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 190 €/MWh with an average of 120 €/MWh.