2,374MWh Curtailed
2,448MWh Ramped Up
€0.77MEst. Cost
193 MWPeak Positive
Day-Ahead Spot: -5-193 €/MWh (avg 103)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TransnetBW | positive | 2 | 6,666 |
| TenneT DE | negative | 3 | 4,368 |
| Amprion | negative | 3 | 4,336 |
| 50Hertz | negative | 2 | 1,072 |
| TenneT DE | positive | 2 | 266 |
| TransnetBW | negative | 1 | 61 |
| 50Hertz | positive | 1 | 12 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 | TransnetBW | Konventionell | positive | 360 | 6,388 | 22:August-15:August |
| NIEDERAUSSEM_K | Amprion | Konventionell | negative | 257 | 2,952 | 22:August-09:August |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 300 | 2,700 | 08:August-17:August | |
| KMW_KW3 | Amprion | Konventionell | negative | 151 | 1,325 | 22:August-06:August |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 1,088 | 09:August-17:August | |
| 50H PV Witznitz | 50Hertz | negative | 213 | 1,067 | 09:August-16:August | |
| BAG NWAK-Cluster 12 Pirach-Simbach | TenneT DE | negative | 80 | 580 | 09:August-17:August | |
| Börse | TransnetBW | Sonstiges | positive | 37 | 278 | 22:August-14:August |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 35 | 140 | 22:August-02:August |
| Gebersdorf GT | TenneT DE | Konventionell | positive | 63 | 126 | 22:August-00:August |
| Börse | TransnetBW | Sonstiges | negative | 30 | 61 | 22:August-16:August |
| HAMMUENTROP_20 | Amprion | Konventionell | negative | 59 | 59 | 23:August-00:August |
| Börse | 50Hertz | Sonstiges | positive | 24 | 12 | 00:August-02:August |
| Börse | 50Hertz | Sonstiges | negative | 19 | 5 | 03:August-03:August |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.23M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-08-02?
On 2026-08-02, estimated redispatch costs were approximately €0.77 million. This includes €0.24M for renewable curtailment compensation and €0.33M for conventional ramp-up costs.
Which power plants were most affected on 2026-08-02?
The most affected plant was Rheinhafen-Dampfkraftwerk Karlsruhe Block 8 (TransnetBW) with 6,388 MWh of positive redispatch.
What was the electricity spot price on 2026-08-02?
The EPEX Day-Ahead spot price for DE_LU ranged from -5 to 193 €/MWh with an average of 103 €/MWh.